# Windshield molding bonding procedure (2003)

Canonical URL: https://miatatorque.com/spec/windshield-molding-bond-installation-2003/

Applicability: NB 2003 (BP-Z3)

Confidence: fsm

Primer drying approximately 30 minutes; sealant bead 3.0 mm {0.12 in}. Surface hardening / return to service: approximately 1.5 h / 12 h at 5°C {41°F};1 h / 4 h at 20°C {68°F};10 min / 2 h at 35°C {95°F}.

Always confirm against your factory manual. Match every restriction and follow all stages and procedure notes. Disputed claims must not be automatically resolved. The complete record below preserves every printed unit, source claim and procedure.

```json
{
  "id": "windshield-molding-bond-installation-2003",
  "name": "Windshield molding bonding procedure (2003)",
  "aliases": [],
  "applies_to": [
    {
      "gen": "NB",
      "years": [
        2003,
        2003
      ],
      "engines": [
        "BP-Z3"
      ]
    }
  ],
  "kind": "non-torque",
  "value_text": "Primer drying approximately 30 minutes; sealant bead 3.0 mm {0.12 in}. Surface hardening / return to service: approximately 1.5 h / 12 h at 5°C {41°F};1 h / 4 h at 20°C {68°F};10 min / 2 h at 35°C {95°F}.",
  "procedure": {
    "notes": "For the original factory molding repair process, not glass replacement bead height or an arbitrary modern adhesive. Protect the adjacent body with tape and wear gloves when cutting old sealant with a razor. Use SST 49 G0501A0 to cut near the body and then near the glass; the section drawing locates the glass-side cut 2.0–3.0 mm {0.08–0.11 in} inboard of the glass edge. Remove as much old sealant as possible between glass and body, clean the glass edge/body adhesion surface, keep it free of dirt and grease, and do not touch prepared surfaces. Surface hardening is separate from time until the vehicle can be put into service; the three temperature rows give no interpolation rule. Check for water leaks after installation; if leaking, dry thoroughly and repeat installation. Align the protector edge with the body spot mark and bond securely; the protector top is 3.3 mm {0.13 in} below the upper body surface in the factory section. Brush glass primer onto glass and body primer onto body and new molding. Dry approximately 30 minutes, apply a 3.0 mm {0.12 in} bead between glass and body, and reshape it within that joint. Install molding before sealant hardens: align molding center mark with glass mark, seat upper portions, push corners into place, then push sides beginning at the bottom."
  },
  "confidence": "fsm",
  "sources": [
    {
      "source": "fsm-2003",
      "page": "Windshield Molding Installation (PDF pp.1975–1981)",
      "as_printed": "Allow the primer to dry for approximately 30 minutes.\nApply a 3.0 mm {0.12 in} bead of sealant between the glass and the body.\nInstall the windshield molding before the sealant has hardened.\nTemperature Surface hardening time Time required until vehicle can be put into service\n5°C {41°F} Approx. 1.5 h Approx. 12 h\n20°C {68°F} Approx. 1 h Approx. 4 h\n35°C {95°F} Approx. 10 min Approx. 2 h",
      "verified_years": [
        2003,
        2003
      ],
      "document": {
        "id": "fsm-2003",
        "tier": 1,
        "title": "2003 Mazda MX-5 Miata Workshop Manual (electronic manual capture)",
        "covers": [
          {
            "gen": "NB",
            "years": [
              2003,
              2003
            ],
            "engines": [
              "BP-Z3"
            ]
          }
        ],
        "note": "Normally aspirated BP procedures audited; turbo procedures are covered separately."
      }
    }
  ],
  "jobs": [],
  "system": "body",
  "component": "release-validation-2003-2026-11",
  "componentName": "Factory service specifications (2003)",
  "sequence_diagrams": [],
  "url": "https://miatatorque.com/spec/windshield-molding-bond-installation-2003/"
}
```
