All NA & NB Miatas

Cylinder head bolts

56–60 ft·lb76–81 N·m76–81 N·m56–60 ft·lb
Factory manualTaken from a Mazda factory workshop manual, with page citation.
Procedure
Lubrication
Clean engine oil on the threads and seat faces
Replace
Head gasket
Sequence
10 bolts, center outward, in 2–3 steps. Intake row 8-4-1-5-9, exhaust row 7-3-2-6-10.

The manual prints only the final value; no intermediate step values.

Applies to
  • NA 1990–1993 (B6)
  • Verified in: 1990 Mazda MX-5 Miata Workshop Manual
Sources