ABS controller power supply harness test (1999–2000)
System supply A relative to ground AB: ignition ON B+; ignition OFF 0 V. During the DTC63 engine-starting check: 10—15 V.System supply A relative to ground AB: ignition ON B+; ignition OFF 0 V. During the DTC63 engine-starting check: 10—15 V.
Turn ignition OFF before disconnecting or reconnecting the separate ABS control module. Disconnect its connector and attach harness adapter SST49 F066 002 to the harness, then connect the meter to the adapter. Use the factory-lettered adapter terminals; do not infer a pin-face position or probe the controller itself. Perform resistance/continuity checks without applied power, and voltage checks only in the separately stated powered conditions. Measure system supply terminal A relative to ABS harness ground AB. Observe ignition OFF and ON separately. For DTC63 first inspect battery terminal voltage and connections, then inspect the A supply and AB ground connector contacts. Measure A–AB during engine starting and compare with 10—15 V. If incorrect repair the supply or ground harness; follow the complete erase-and-reinspect DTC63 procedure afterward. B+ in the normal supply table means battery voltage; it does not replace the separate starting-condition range.
- NB 1999–2000 (BP-4W, ABS) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
- Verified in: 1999 Mazda MX-5 Miata Workshop Manual
Sources (2)
View 2 source citations
Page 04–13–5–6 (PDF pp. 413–414) · Printed value & notes
Page 04–13–5–6 (PDF pp. 413–414)Printed: “A Voltage supply (System) Voltage IG SW is at ON B+ IG SW is off 0 V AB, AC, AM System GND”Page 04–01–9 (PDF p. 381) · Printed value & notes
Page 04–01–9 (PDF p. 381)Printed: “Is voltage of ABS CM harness between A terminal (power supply) and AB terminal (ground) 10—15 V when starting engine?”
Related service specs
- Brake fluid reservoir level during bleeding (1999–2000)
- Brake switch component continuity (1999–2000)
- Brake booster pushrod reference clearance (1999–2000, without ABS)
- Brake fluid level sensor continuity (1999–2000)
- Brake booster vacuum retention, unloaded (1999–2000)
- Brake booster vacuum retention, loaded (1999–2000)
- Brake booster simple function inspection (1999–2000)
- Brake booster hydraulic pressure, unassisted (1999–2000)