Differential mounting rubber installation force and orientation (1990–1991)
Press force: 2,000 kg (2 tons); install new mounting rubber with the voids facing fore and aft.Press force: 2,000 kg (2 tons); install new mounting rubber with the voids facing fore and aft.
Differential removed for overhaul. Replace the mounting rubber after removal. The factory procedure drills around the old rubber and removes it at its edge, then presses in a new rubber with SST 49 N034 213. Align the voids with the vehicle front-to-rear direction shown in the original illustration, and support the mounting eye as shown during pressing. The printed press force is an installation instruction, not a rubber acceptance load or mount-nut torque.
- NA 1990–1991 (B6) — 1990 applicability is supported by the cited 1990 factory pages; 1991 follows the owner-approved 1990-to-short-crank-1991 carry-over policy. No 1991 revision verification or long-crank applicability is claimed.
- Verified in: 1990 Mazda MX-5 Miata Workshop Manual
Sources (1)
View 1 source citations
Page M–32 / M–36 (PDF pp. 415, 419) · Printed value & notes
Part no. 1193-10-89CPage M–32 / M–36 (PDF pp. 415, 419)Printed: “Use a new mounting rubber when reassembling. Install the mounting rubber with the voids facing fore and aft. Press in the new differential mounting rubber with the SST. Press force: 2,000 kg (2 tons)”
Related service specs
- Five-speed propeller shaft nominal dimensions (1990–1991)
- Differential nominal final-drive ratio and ring gear size (1990–1991)
- Drive-shaft joint and boot grease quantities (1990–1991)
- Drive-shaft length during boot banding (1990–1991)
- Viscous differential wheel-rotation time inspection (1990–1991)
- Differential ring-gear thread-locking compound application (1990–1991)
- Differential nominal ring gear size (1992–1993)
- Differential mount rubber press force and orientation (1992–1993)