Factory windshield and hardtop rear-glass repair-seal hardening times (1990–1991)
41 °F (5 °C): surface approximately 1.5 hr / service after 12 hr; 68 °F (20 °C): surface approximately 1 hr / service after 4 hr; 95 °F (35 °C): surface approximately 10 min / service after 2 hr.5°C (41°F): surface approximately 1.5 hr / service after 12 hr; 20°C (68°F): surface approximately 1 hr / service after 4 hr; 35°C (95°F): surface approximately 10 min / service after 2 hr.
For the original factory repair seal used with windshield and detachable-hardtop rear-glass molding installation. Surface hardening and time until the car can be put into service are different columns; use the stated service time at the stated temperature. The table gives three temperatures without an interpolation rule. It does not establish curing times for an unspecified modern replacement adhesive; follow its applicable material instructions. Primer drying is a separate interval. Lower the convertible top when installing the windshield molding to prevent door-closing air pressure from pushing the glass out. Check for water leaks after installation, drying the area and repeating installation if a leak is found.
- NA 1990–1991 (B6) — 1990 applicability is supported by the cited 1990 factory pages; 1991 follows the owner-approved 1990-to-short-crank-1991 carry-over policy. No 1991 revision verification or long-crank applicability is claimed.
- Verified in: 1990 Mazda MX-5 Miata Workshop Manual
Sources (4)
View 4 source citations
Page S–28 (PDF p.535) · Printed value & notes
Part no. 1193-10-89CPage S–28 (PDF p.535)Printed: “Hardening time of repair seal Temperature Surface hardening time Time required until car can be put into service 5°C (41°F) Approx. 1.5 hr 12 hr 20°C (68°F) Approx. 1hr 4 hr 35°C (95°F) Approx. 10 min 2 hr”Page S–29 (PDF p.536) · Printed value & notes
Part no. 1193-10-89CPage S–29 (PDF p.536)Printed: “Hardening time of repair seal Temperature Surface hardening time Time required until car can be put into service 5°C (41°F) Approx. 1.5 hr 12 hr 20°C (68°F) Approx. 1hr 4 hr 35°C (95°F) Approx. 10 min 2 hr”Page S–40 (PDF p.547) · Printed value & notes
Part no. 1193-10-89CPage S–40 (PDF p.547)Printed: “Hardening time of repair seal Temperature Surface hardening time Time required until car can be put into service 5°C (41°F) Approx. 1.5 hr 12 hr 20°C (68°F) Approx. 1hr 4 hr 35°C (95°F) Approx. 10 min 2 hr”Page S–44 (PDF p.551) · Printed value & notes
Part no. 1193-10-89CPage S–44 (PDF p.551)Printed: “Hardening time of repair seal Temperature Surface hardening time Time required until car can be put into service 5°C (41°F) Approx. 1.5 hr 12 hr 20°C (68°F) Approx. 1hr 4 hr 35°C (95°F) Approx. 10 min 2 hr”
Related service specs
- Original tachometer winding resistance (2005, non-turbo)
- Original fuel gauge winding resistance (2005, non-turbo)
- Original water temperature gauge winding resistance (2005, non-turbo)
- Original oil pressure gauge winding resistance (2005, non-turbo)
- Door-lock removal glass position and screen preservation (1990–1991)
- Power-window main-switch supply and harness ground checks (1990–1991)
- Wiper switch and motor harness voltage checks (1990–1991 USA)
- Washer switch and motor harness voltage and ground checks (1990–1991 USA)