Showing specs for all NA & NB Miatas

Factory windshield and rear-glass sealant hardening times (2004–2005)

41 °F (5 °C): surface approximately 1.5 h / service approximately 12 h; 68 °F (20 °C): surface approximately 1 h / service approximately 4 h; 95 °F (35 °C): surface approximately 10 min / service approximately 2 h.5°C {41°F}: surface approximately 1.5 h / service approximately 12 h; 20°C {68°F}: surface approximately 1 h / service approximately 4 h; 35°C {95°F}: surface approximately 10 min / service approximately 2 h.

Factory manualTaken from a Mazda factory workshop manual, with page citation.
Procedure

Factory installation-table times for the specified windshield/hardtop rear-glass sealing process. Surface hardening and readiness to put the vehicle into service are different stages: fit the molding before surface hardening and observe the longer service time at the stated temperature. These pages do not identify a substitute adhesive or give an interpolation rule. Open all windows and leave them open until the sealant hardens so door-closing air pressure cannot crack the sealant or push the glass out. Smooth ooze, add sealant at poor contact and remove excess with isopropyl alcohol. These facts do not supply the complete glass-replacement procedure.

Applies to
  • NB 2005 (BP-Z3/BP-Z3-TURBO)
  • NB 2004 (BP-Z3-TURBO) — 2005 Mazdaspeed applicability is supported by the cited 2005 factory pages; 2004 Mazdaspeed follows the owner-approved 2004–2005 Mazdaspeed carry-over policy. No 2004 Mazdaspeed revision verification is claimed.
  • Verified in: 2005 Mazda MX-5 Miata Workshop Manual (electronic manual capture)

Sources (1)

View 1 source citations
  • 2005 Mazda MX-5 Miata Workshop Manual (electronic manual capture)Tier 1
    Page Rear Window Glass Installation; Windshield Installation (PDF pp.2001,2003,2009,2012) · Printed value & notes
    Page Rear Window Glass Installation; Windshield Installation (PDF pp.2001,2003,2009,2012)
    Printed: “Temperature Surface hardening time Time required until vehicle can be put into service 5°C {41°F} Approx. 1.5 h Approx. 12 h 20°C {68°F} Approx. 1 h Approx. 4 h 35°C {95°F} Approx. 10 min Approx. 2 h”