Five-terminal relay coil and changeover-contact test (2004–2005)
Unpowered: A–E coil circuit and B–D contact continuity; C–D open. Battery positive to A, ground to E: C–D continuity and B–D open.Unpowered: A–E coil circuit and B–D contact continuity; C–D open. Battery positive to A, ground to E: C–D continuity and B–D open.
Remove the relay and test it isolated from the vehicle harness. The physical map below looks directly at the exposed relay terminals, as explicitly captioned by Mazda; do not mirror it to the harness socket. With no external power, check the coil path and the switched contacts. Then apply battery positive and ground only to the specified coil terminals and check the switched contacts; do not connect an ohmmeter to an externally powered coil. Coil continuity is a winding path, not a zero-ohm contact specification. Replace a relay that fails the factory test. No numerical coil resistance, current, operating time or contact-resistance limit is supplied. The listed functions share this factory test family; that alone does not establish relay interchangeability. Hold the T-shaped face with the crossbar at top and stem pointing down. The crossbar is E left, B center, A right; the stem is C above D. D is the changeover common, connected to B while unpowered and C with the coil powered. The A–E coil circuit includes a parallel resistor.
- NB 2005 (BP-Z3/BP-Z3-TURBO)
- NB 2004 (BP-Z3-TURBO) — 2005 Mazdaspeed applicability is supported by the cited 2005 factory pages; 2004 Mazdaspeed follows the owner-approved 2004–2005 Mazdaspeed carry-over policy. No 2004 Mazdaspeed revision verification is claimed.
- Verified in: 2005 Mazda MX-5 Miata Workshop Manual (electronic manual capture)
Sources (1)
View 1 source citations
- 2005 Mazda MX-5 Miata Workshop Manual (electronic manual capture)Tier 1
Page Relay Inspection — Five-terminal (PDF pp.2376–2377) · Printed value & notes
Page Relay Inspection — Five-terminal (PDF pp.2376–2377)Printed: “Five-terminal Remove the relay. Inspect for continuity between the relay terminals using an ohmmeter. If not as specified, replace the relay. Step Terminal A E B C D 1 2 B+ GND”
Related service specs
- Airbag service handling and inspection limits (2004–2005)
- New SAS module authorization and lamp check (2004–2005)
- Airbag warning lamp check after service (2004–2005)
- PAD switch isolated continuity and bulb paths (2004–2005)
- Seat-belt buckle switch continuity (2004–2005)
- Seat-belt emergency-locking retractor check (2004–2005)
- Removed clock-spring conductor continuity (2004–2005)
- Fuel-filler lid panel gap and flushness (2004–2005)