Five-speed assembly sealant timing (1992–1993)
Assemble within 10 minutes after applying sealant; allow at least 30 minutes after assembly before filling with transmission oil.Assemble within 10 minutes after applying sealant; allow at least 30 minutes after assembly before filling with transmission oil.
For the original five-speed overhaul assembly, clean all parts completely and replace all O-rings and gaskets with the new overhaul-kit parts. Apply sealant at the factory-specified joints, assemble within the stated window, and allow the stated minimum cure before filling. These times do not establish a universal sealant grade or permit filling an incomplete assembly.
- NA 1992–1993 (B6, 5MT) — 1992 applicability is supported by the cited 1992 factory pages; 1993 follows the owner-approved 1992–1993 NA6 carry-over policy. No 1993 revision verification is claimed.
- Verified in: 1992 Mazda MX-5 Miata Workshop Manual
Sources (1)
View 1 source citations
- 1992 Mazda MX-5 Miata Workshop ManualTier 1
Page J–26 (PDF p.370) · Printed value & notes
Part no. 1271-10-91G (9999-95-0428-92)Page J–26 (PDF p.370)Printed: “Assemble the parts within 10 minutes after applying sealant. Allow all sealant to cure at least 30 minutes after assembly before filling the transmission with transmission oil.”
Related service specs
- Five-speed nominal gear ratios (1990–1991)
- Manual gearbox rear oil-seal preparation (1990–1991)
- Five-speed assembly sealant timing (1990–1991)
- Five-speed front-cover bearing shim selection (1990–1991)
- Five-speed shift-rod gate to control-lever wear limit (1990–1991)
- Five-speed overhaul rear oil-seal preparation (1992–1993)
- Five-speed rod-cover preparation and orientation (1992–1993)
- Reverse-idler gear adjustment-washer clearance (1992–1993)