Oil pan installation time after baffle sealant application (1992–1993)
Secure the oil pan within 5 minutes after applying sealant to the baffle.Secure the oil pan within 5 minutes after applying sealant to the baffle.
During engine assembly, clean the baffle and pan contact surfaces. Apply a continuous bead of silicone sealant to the baffle inside the bolt holes and install the baffle. Install the oil strainer with a new gasket using its separately specified bolt torque. Apply silicone to the factory-indicated front and rear junctions, and seat new end gaskets on the oil-pump body and rear cover with their projections in the notches. Apply a continuous silicone bead inside the pan bolt holes, overlap the bead ends, and secure the pan within the time limit using the separately specified oil-pan bolt torque. The clock starts with baffle sealant application; no bead diameter or engine restart time is specified here.
- NA 1992–1993 (B6) — 1992 applicability is supported by the cited 1992 factory pages; 1993 follows the owner-approved 1992–1993 NA6 carry-over policy. No 1993 revision verification is claimed.
- Verified in: 1992 Mazda MX-5 Miata Workshop Manual
Sources (1)
View 1 source citations
- 1992 Mazda MX-5 Miata Workshop ManualTier 1
Page B–68–B–69 (PDF pp. 104–105) · Printed value & notes
Part no. 1271-10-91G (9999-95-0428-92)Page B–68–B–69 (PDF pp. 104–105)Printed: “The oil pan must be secured within 5 minutes after the sealant is applied to the baffle. Apply a continuous bead of silicone sealant to the baffle along the inside of the bolt holes. Install the baffle. Install new gaskets onto the oil pump body and the rear cover with the projections in the notches shown in the figure. Apply a continuous bead of silicone sealant to the oil pan along the inside of the bolt holes and overlap the ends.”