Showing specs for all NA & NB Miatas

PCM mounting bolt and nut (1999–2000)

70–95 in·lb in·lb7.9–10.7 N·m7.9–10.7 N·m70–95 in·lb in·lb
Factory manualTaken from a Mazda factory workshop manual, with page citation.
Procedure

Disconnect battery negative and unplug the PCM above the brake pedal before removal. Remove its installation bolt. For the installation nut, move the PCM harness away from the brake-pedal bracket, then move the stay clear of the stud before removing the nut. Install in reverse order. The printed torque applies to the PCM installation bolt and nut, not the brake-pedal pivot, brake switch or a connector retaining screw.

Applies to
  • NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
  • Verified in: 1999 Mazda MX-5 Miata Workshop Manual

Sources (1)

View 1 source citations
  • Page 01–40–3 (PDF p. 292) · Printed value & notes
    Page 01–40–3 (PDF p. 292)
    70–95 in·lb (7.9–10.7 N·m)
    Printed: “Tightening torque bolt, nut: 7.9—10.7 N·m {80—110 kgf·cm, 70—95.4 in·lbf}”