Showing specs for all NA & NB Miatas

Power steering tube-side oil seal installation (1992–1993)

Press load must not exceed 400 kg (880 lb); after installation, rack-end-to-holder distance is 0.39–0.55 in (10–14 mm).Press load must not exceed 400 kg (880 lb); after installation, rack-end-to-holder distance is 10–14 mm (0.39–0.55 in).

Factory manualTaken from a Mazda factory workshop manual, with page citation.
Procedure

Original power steering gear assembly. Grease a new seal and protect it over the rack using SST 49 N032 301 and 49 N032 302, sliding it from gear side to the piston; remove the protector and install the backup ring. Grease rack teeth and friction surfaces, insert the rack from the tube side using SST 49 G032 305. Install the holder with greased new Y-packing and new O-ring using SST 49 N032 304, then fit a new stop ring. Press the new oil seal from the tube side with a suitable 22 mm (0.86 in) diameter pipe. The 10–14 mm dimension is between the rack end and holder shown in the factory section, not an inferred seal depth.

Applies to
  • NA 1992–1993 (B6) — 1992 applicability is supported by the cited 1992 factory pages; 1993 follows the owner-approved 1992–1993 NA6 carry-over policy. No 1993 revision verification is claimed.
  • Verified in: 1992 Mazda MX-5 Miata Workshop Manual

Sources (1)

View 1 source citations
  • 1992 Mazda MX-5 Miata Workshop ManualTier 1
    Page N–30 (PDF p.630) · Printed value & notes
    Part no. 1271-10-91G (9999-95-0428-92)
    Page N–30 (PDF p.630)
    Printed: “Press in a new oil seal from tube side with a suitable pipe (Dia. 22mm (0.86 in)). Do not press over 400 kg (880 lb). Verify that the distance between the end of the rack and the holder is 10—14mm (0.39—0.55 in).”