Updated specs are available.
Propeller-shaft maximum runout (1999–2000)
This spec doesn't apply to the car you selected.
Not yet checked against the factory manual for your car's year. It's verified in the 1999 Mazda MX-5 Miata Workshop Manual; later manuals may differ.
0.016 in (0.4 mm), maximum0.4 mm {0.016 in}, maximum
Factory manualTaken from a Mazda factory workshop manual, with page citation.
Procedure
Remove and clean the propeller shaft, keeping solvent/steam away from the sealed universal-joint bearings so their grease is not washed out. Support the removed shaft at the factory figure’s two locations, rotate it and measure tube runout with a dial indicator as shown. Replace the propeller shaft if runout is excessive; the source does not specify straightening. The support/dial-indicator arrangement is for this propeller-shaft inspection, not a wheel or axle-shaft runout test.
Applies to
- NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
- Verified in: 1999 Mazda MX-5 Miata Workshop Manual
Sources (1)
View 1 source citations
Page 03–15–2 (PDF p. 369) · Printed value & notes
Page 03–15–2 (PDF p. 369)Printed: “Cleaning sealed bearings with cleaning fluids or a steam cleaner can wash the grease out of the bearing. Clean the propeller shaft (except for the universal joint) with a steam cleaner or solvent. Measure the propeller shaft runout by using a dial indicator. Replace the propeller shaft if runout is excessive. Maximum runout 0.4 mm {0.016 in}”
Related service specs
- Drive-shaft differential retaining clip installed diameter (1999–2000)
- Drive-shaft length during boot-band assembly (1999–2000)
- Differential mount installation maximum press force (1999–2000)
- Differential pinion locknut overhaul tightening sequence (1999–2000)
- Propeller-shaft universal-joint starting torque (1999–2000)