Rearview mirror base bonding procedure (1999–2000)
Base sealant height: 0.12 in (3.0 mm); primer drying: approximately 30 min. Surface hardening/service: 1.5 h/12 h at 41 °F (5 °C); 1 h/4 h at 68 °F (20 °C); 10 min/2 h at 95 °F (35 °C) (all approximate).Base sealant height: 3.0 mm {0.12 in}; primer drying: approximately 30 min. Surface hardening/service: 1.5 h/12 h at 5 °C {41 °F}; 1 h/4 h at 20 °C {68 °F}; 10 min/2 h at 35 °C {95 °F} (all approximate).
For the interior rearview mirror mounting base bonded to the windshield ceramic coating. Release the base pin to remove the mirror first. When removing the base with piano wire, wear gloves, wrap both wire ends around bars and use the full wire length. Wear gloves when cutting away all original sealant. Clean and degrease the ceramic coating and base; keep both clean and do not touch the prepared bonding surfaces. Apply glass primer to the glass and body primer to the base; dry approximately 30 minutes. Apply sealant 3.0 mm {0.12 in} high in the central patch and surrounding ring indicated for this factory base, center it in the ceramic area and press it onto the glass. The positioning drawing shows a 5.0 mm {0.2 in} ceramic margin above the centered base. Remove excess sealant with white gasoline as directed. For the factory sealant, the surface-hardening/service times are respectively approximately 1.5 h/12 h at 5 °C {41 °F}, 1 h/4 h at 20 °C {68 °F}, and 10 min/2 h at 35 °C {95 °F}. Surface hardening is distinct from return to service. Install the rearview mirror after the base procedure. These conditions describe the specified factory repair sealant, not arbitrary replacement adhesives.
- NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
- Verified in: 1999 Mazda MX-5 Miata Workshop Manual
Sources (1)
View 1 source citations
Page 09–12–23–25 (PDF pp.644–646) · Printed value & notes
Page 09–12–23–25 (PDF pp.644–646)Printed: “Allow the primer to dry for approximately 30 minutes. Apply a height of 3.0 mm {0.12 in} sealant to the base. 5.0 {0.2} Hardening time of sealant 5 °C {41 °F} Approx. 1.5 h Approx. 12 h 20 °C {68 °F} Approx. 1 h Approx. 4 h 35 °C {95 °F} Approx. 10 min Approx. 2 h”
Related service specs
- Cruise actuator cable free play (1999–2000)
- Airbag warning-lamp self-test (1999–2000)
- SAS control-module isolation wait (1999–2000)
- Clock-spring centering (1999–2000)
- Airbag post-deployment handling (1999–2000)
- Airbag deployment-tool self-check (1999–2000)
- Seat-belt emergency-locking retractor check (1999–2000)
- Seat-belt automatic-locking mode check (1999–2000)