Showing specs for all NA & NB Miatas

A/C compressor service-valve attachment bolts (1992–1993)

109 in·lb in·lb12.3 N·m12.3 N·m109 in·lb in·lb
Factory manualTaken from a Mazda factory workshop manual, with page citation.
Procedure

Original factory R-12 compressor only. Recover refrigerant before removal; keep open fittings plugged. Do not disassemble the central compressor body. Install new housing gaskets and lubricate the shaft seal with the specified compressor oil. These internal overhaul bolts are distinct from compressor-to-engine mounting bolts and external hose connections. Bolts attaching the suction/discharge service-valve assemblies to the compressor housing, not the refrigerant hose fitting nuts or the service-port caps. Apply the specified compressor oil to new O-rings, install the valves and tighten their attachment bolts. This follows completion of the compressor housing/valve-body tightening and oil refill.

Applies to
  • NA 1992–1993 (B6) — 1992 applicability is supported by the cited 1992 factory pages; 1993 follows the owner-approved 1992–1993 NA6 carry-over policy. No 1993 revision verification is claimed.
  • Verified in: 1992 Mazda MX-5 Miata Workshop Manual

Sources (2)

View 2 source citations
  • 1992 Mazda MX-5 Miata Workshop ManualTier 1
    Page U–49 (PDF p. 1041) · Printed value & notes
    Part no. 1271-10-91G (9999-95-0428-92)
    Page U–49 (PDF p. 1041)
    109 in·lb (12.3 N·m)
    Printed: “Tightening torque: 12.3 N·m (125 cm-kg, 109 in-lb)”
  • 1992 Mazda MX-5 Miata Workshop ManualTier 1
    Page U–47 (PDF p. 1039) · Printed value & notes
    Part no. 1271-10-91G (9999-95-0428-92)
    Page U–47 (PDF p. 1039)
    Printed: “Do not disassemble the compressor body. Lubricate the shaft seal with the compressor oil. Install the new gaskets and pin on the compressor body.”