Automatic front clutch air operation test (1992–1993)
Air pressure maximum 57 psi (392 kPa; 4.0 kg/cm²); apply air for no more than three seconds during the assembled operation check.Air pressure maximum 392 kPa (4.0 kg/cm², 57 psi); apply air for no more than three seconds during the assembled operation check.
Install the front clutch on the drum support with the seal rings in place. Apply compressed air through the passage identified in the factory front-clutch figure and verify that the retaining plate moves toward the snap ring. If incorrect, inspect the seal ring, O-ring and piston check ball for damage or leakage and replace parts when assembling. The assembly continuation limits air application to three seconds. The front clutch uses its own illustrated passage; do not substitute another clutch connection. This is separate from the removed piston check-ball leak test.
- NA 1992–1993 (B6, 4AT) — 1992 applicability is supported by the cited 1992 factory pages; 1993 follows the owner-approved 1992–1993 NA6 carry-over policy. No 1993 revision verification is claimed.
- Verified in: 1992 Mazda MX-5 Miata Workshop Manual
Sources (2)
View 2 source citations
- 1992 Mazda MX-5 Miata Workshop ManualTier 1
Page K–73 (PDF p. 465) · Printed value & notes
Part no. 1271-10-91G (9999-95-0428-92)Page K–73 (PDF p. 465)Printed: “Front clutch operation Air pressure: 392 kPa (4.0 kg/cm², 57 psi) max. Verify that the retaining plate moves toward the snap ring.” - 1992 Mazda MX-5 Miata Workshop ManualTier 1
Page K–77 (PDF p. 469) · Printed value & notes
Part no. 1271-10-91G (9999-95-0428-92)Page K–77 (PDF p. 469)Printed: “Apply air for no more than three (3) seconds. Air pressure: 392 kPa (4.0 kg/cm², 57 psi) max.”
Related service specs
- Five-speed nominal gear ratios (1990–1991)
- Manual gearbox rear oil-seal preparation (1990–1991)
- Five-speed assembly sealant timing (1990–1991)
- Five-speed front-cover bearing shim selection (1990–1991)
- Five-speed shift-rod gate to control-lever wear limit (1990–1991)
- Five-speed assembly sealant timing (1992–1993)
- Five-speed overhaul rear oil-seal preparation (1992–1993)
- Five-speed rod-cover preparation and orientation (1992–1993)