Automatic low/reverse brake air operation test (1992–1993)
Air pressure maximum 57 psi (392 kPa; 4.0 kg/cm²); apply air for no more than three seconds during the assembled operation check.Air pressure maximum 392 kPa (4.0 kg/cm², 57 psi); apply air for no more than three seconds during the assembled operation check.
Apply compressed air through the low-and-reverse brake passage shown in the factory case figure. Verify that the retaining plate moves toward the snap ring. If incorrect, inspect the seal ring, O-ring and piston check ball for damage or leakage during assembly and replace as necessary. The final assembled check follows installation of the lubricated piston with new seal ring and O-ring, correctly positioned return spring/thrust washer/inner race, new inner-race bolts and washers, and the plate stack, retaining plate and snap ring with clearance checked. The final check limits air application to three seconds. This operation test is separate from removing the piston and testing its check ball.
- NA 1992–1993 (B6, 4AT) — 1992 applicability is supported by the cited 1992 factory pages; 1993 follows the owner-approved 1992–1993 NA6 carry-over policy. No 1993 revision verification is claimed.
- Verified in: 1992 Mazda MX-5 Miata Workshop Manual
Sources (2)
View 2 source citations
- 1992 Mazda MX-5 Miata Workshop ManualTier 1
Page K–89 (PDF p. 481) · Printed value & notes
Part no. 1271-10-91G (9999-95-0428-92)Page K–89 (PDF p. 481)Printed: “Low and reverse brake operation Air pressure: 392 kPa (4.0 kg/cm², 57 psi) max. Verify that the retaining plate moves toward the snap ring.” - 1992 Mazda MX-5 Miata Workshop ManualTier 1
Page K–92–K–93 (PDF pp. 484–485) · Printed value & notes
Part no. 1271-10-91G (9999-95-0428-92)Page K–92–K–93 (PDF pp. 484–485)Printed: “Apply air for no more than three (3) seconds. Air pressure: 392 kPa (4.0 kg/cm², 57 psi) max.”
Related service specs
- Five-speed nominal gear ratios (1990–1991)
- Manual gearbox rear oil-seal preparation (1990–1991)
- Five-speed assembly sealant timing (1990–1991)
- Five-speed front-cover bearing shim selection (1990–1991)
- Five-speed shift-rod gate to control-lever wear limit (1990–1991)
- Five-speed assembly sealant timing (1992–1993)
- Five-speed overhaul rear oil-seal preparation (1992–1993)
- Five-speed rod-cover preparation and orientation (1992–1993)