Automatic OD band servo air operation and removal (1992–1993)
Air pressure maximum 57 psi (392 kPa; 4.0 kg/cm²). Apply air for no more than three seconds during the final assembled operation check.Air pressure maximum 392 kPa (4.0 kg/cm², 57 psi). Apply air for no more than three seconds during the final assembled operation check.
For OD-band-servo preinspection, apply compressed air through the factory-identified case oil passage and verify that the piston stem moves toward the brake band. If incorrect, inspect seal rings, the oil seal and possible piston sticking during assembly. During disassembly, apply air through the servo body oil passage to remove the piston assembly, using the separate factory removal figure. These two operations use the same printed maximum pressure but different assembly states and passages. This limit is not a hydraulic line-pressure setting or the band-adjustment torque. After the OD-band seating, two-turn backoff and locknut adjustment, check assembled servo operation through its case passage for no more than three seconds before fitting the cover with a new gasket.
- NA 1992–1993 (B6, 4AT) — 1992 applicability is supported by the cited 1992 factory pages; 1993 follows the owner-approved 1992–1993 NA6 carry-over policy. No 1993 revision verification is claimed.
- Verified in: 1992 Mazda MX-5 Miata Workshop Manual
Sources (3)
View 3 source citations
- 1992 Mazda MX-5 Miata Workshop ManualTier 1
Page K–62 (PDF p. 454) · Printed value & notes
Part no. 1271-10-91G (9999-95-0428-92)Page K–62 (PDF p. 454)Printed: “OD band servo operation Apply compressed air through the oil passage shown. Air pressure: 392 kPa (4.0 kg/cm², 57 psi) max. Verify that the piston stem moves toward the brake band.” - 1992 Mazda MX-5 Miata Workshop ManualTier 1
Page K–63 (PDF p. 455) · Printed value & notes
Part no. 1271-10-91G (9999-95-0428-92)Page K–63 (PDF p. 455)Printed: “Remove the piston assembly from the body by applying compressed air through the oil passage hole. Air pressure: 392 kPa (4.0 kg/cm², 57 psi) max.” - 1992 Mazda MX-5 Miata Workshop ManualTier 1
Page K–124 (PDF p. 516) · Printed value & notes
Part no. 1271-10-91G (9999-95-0428-92)Page K–124 (PDF p. 516)Printed: “Apply air for no more than three (3) seconds. Air pressure: 392 kPa (4.0 kg/cm², 57 psi) max.”
Related service specs
- Five-speed nominal gear ratios (1990–1991)
- Manual gearbox rear oil-seal preparation (1990–1991)
- Five-speed assembly sealant timing (1990–1991)
- Five-speed front-cover bearing shim selection (1990–1991)
- Five-speed shift-rod gate to control-lever wear limit (1990–1991)
- Five-speed assembly sealant timing (1992–1993)
- Five-speed overhaul rear oil-seal preparation (1992–1993)
- Five-speed rod-cover preparation and orientation (1992–1993)