Showing specs for all NA & NB Miatas

Circuit-opening relay switching test (1990–1991)

Apply 12 V to STA and ground E1 — B–Fp continuity; apply 12 V to B and ground Fc — Fp at battery voltage.Apply 12 V to STA and ground E1 — B–Fp continuity; apply 12 V to B and ground Fc — Fp at battery voltage.

Factory manualTaken from a Mazda factory workshop manual, with page citation.
Procedure

Perform the two powered relay switching tests separately using the factory relay terminal identification figure. STA, E1, B, Fc and Fp name relay terminals; they are not diagnosis-connector jumper positions. Replace the relay if a result differs. This powered switching check is separate from the unpowered winding-resistance measurements.

Applies to
  • NA 1990–1991 (B6) — 1990 applicability is supported by the cited 1990 factory pages; 1991 follows the owner-approved 1990-to-short-crank-1991 carry-over policy. No 1991 revision verification or long-crank applicability is claimed.
  • Verified in: 1990 Mazda MX-5 Miata Workshop Manual

Sources (1)

View 1 source citations
  • Page F–110 (PDF p. 254) · Printed value & notes
    Part no. 1193-10-89C
    Page F–110 (PDF p. 254)
    Printed: “Apply 12V and a ground to the terminals below and check the circuit opening relay operation as described. 12V Grounded Correct result STA E1 B-Fp: Continuity B Fc Fp: Battery voltage If not as specified, replace the circuit opening relay.”