Showing specs for all NA & NB Miatas

Fuel & Intake

Torque specs

Air cleaner

Air cleaner lower bracket bolt
NA 1990–1993 (B6)
14–19 ft·lb19–25 N·m19–25 N·m14–19 ft·lb
Air cleaner bracket bolt (intake duct side)
NA 1990–1993 (B6)
69–95 in·lb in·lb7.8–11 N·m7.8–11 N·m69–95 in·lb in·lb
Mass airflow sensor mounting bolts (NB2)
NB 2001–2005 (BP-Z3)
70–95 in·lb in·lb7.9–10.7 N·m7.9–10.7 N·m70–95 in·lb in·lb
Air intake hose clamps (NB2)
NB 2001–2005 (BP-Z3)
22–30 in·lb in·lb2.5–3.4 N·m2.5–3.4 N·m22–30 in·lb in·lb
Mazdaspeed mass airflow sensor mounting bolts (NB2)
NB 2004–2005 (BP-Z3-TURBO, 6MT)
70–95 in·lb in·lb7.8–10.8 N·m7.8–10.8 N·m70–95 in·lb in·lb
Mazdaspeed air intake hose clamps (NB2)
NB 2004–2005 (BP-Z3-TURBO, 6MT)
23–30 in·lb in·lb2.5–3.4 N·m2.5–3.4 N·m23–30 in·lb in·lb

Early NB2 factory service checks

Emissions (EGR)

EGR valve bolts
NB 1999–2000 (BP-4W)
14–18 ft·lb19–25 N·m19–25 N·m14–18 ft·lb
EGR pipe flare nut
NB 1999–2000 (BP-4W)
24–34 ft·lb32–47 N·m32–47 N·m24–34 ft·lb
EGR pipe union at intake manifold (NB2)
NB 2001–2005 (BP-Z3)
24–34 ft·lb32–47 N·m32–47 N·m24–34 ft·lb
Mazdaspeed EGR pipe mounting bolts (NB2)
NB 2004–2005 (BP-Z3-TURBO, 6MT)
70–95 in·lb in·lb7.8–10.8 N·m7.8–10.8 N·m70–95 in·lb in·lb
Purge solenoid valve mounting nut (NB2)
NB 2001–2005 (BP-Z3); NB 2004–2005 (BP-Z3-TURBO)
79–112 in·lb in·lb8.9–12.7 N·m8.9–12.7 N·m79–112 in·lb in·lb
EGR pipe union at exhaust manifold (NB2)
NB 2001–2005 (BP-Z3)
≈24–35 ft·lb32–47 N·m32–47 N·m≈24–35 ft·lb
EGR pipe mounting bolts (NB2)
NB 2001–2005 (BP-Z3)
≈70–95 in·lb in·lb7.9–10.7 N·m7.9–10.7 N·m≈70–95 in·lb in·lb

Fuel rail & injectors

Fuel pressure regulator bolts
NA 1994–1997 (BP); NA 1990–1993 (B6)
70–95 in·lb in·lb7.9–10.7 N·m7.9–10.7 N·m70–95 in·lb in·lb
Fuel filter bracket bolt
NA 1994–1997 (BP); NB 1999–2000 (BP-4W); NA 1990–1993 (B6)
70–95 in·lb in·lb7.9–10.7 N·m7.9–10.7 N·m70–95 in·lb in·lb
Injector harness and bracket fasteners
NA 1990–1993 (B6)
69–95 in·lb in·lb7.8–11 N·m7.8–11 N·m69–95 in·lb in·lb
Fuel filter bracket mounting bolt (NB2)
NB 2001–2005 (BP-Z3); NB 2004–2005 (BP-Z3-TURBO)
70–95 in·lb in·lb7.9–10.7 N·m7.9–10.7 N·m70–95 in·lb in·lb

Fuel tank & pump

Fuel pump mounting screws
NB 1999–2000 (BP-4W)
10–19 in·lb in·lb1.1–2.1 N·m1.1–2.1 N·m10–19 in·lb in·lb
Fuel tank bracket bolts
NB 1999–2000 (BP-4W)
16–22 ft·lb22–30 N·m22–30 N·m16–22 ft·lb
Fuel filler neck bracket bolt
NA 1990–1993 (B6)
22–31 in·lb in·lb2.4–3.5 N·m2.4–3.5 N·m22–31 in·lb in·lb
Fuel pump lower mounting bracket screw (NB2)
NB 2004–2005 (BP-Z3); NB 2004–2005 (BP-Z3-TURBO)
25–37 in·lb in·lb2.8–4.2 N·m2.8–4.2 N·m25–37 in·lb in·lb
Fuel tank protector mounting nuts (NB2)
NB 2001–2005 (BP-Z3); NB 2004–2005 (BP-Z3-TURBO)
79–112 in·lb in·lb8.9–12.7 N·m8.9–12.7 N·m79–112 in·lb in·lb
Fuel filler pipe upper mounting bolts (NB2)
NB 2001–2005 (BP-Z3); NB 2004–2005 (BP-Z3-TURBO)
22–31 in·lb in·lb2.5–3.5 N·m2.5–3.5 N·m22–31 in·lb in·lb
Fuel filler pipe lower bracket bolt (NB2)
NB 2001–2005 (BP-Z3); NB 2004–2005 (BP-Z3-TURBO)
79–112 in·lb in·lb8.9–12.7 N·m8.9–12.7 N·m79–112 in·lb in·lb
Fuel tank side bracket bolts (NB2)
NB 2001–2005 (BP-Z3); NB 2004–2005 (BP-Z3-TURBO)
70–104 in·lb in·lb7.9–11.7 N·m7.9–11.7 N·m70–104 in·lb in·lb
Fuel tank side bracket nut (NB2)
NB 2001–2005 (BP-Z3); NB 2004–2005 (BP-Z3-TURBO)
79–112 in·lb in·lb8.9–12.7 N·m8.9–12.7 N·m79–112 in·lb in·lb

Service measurements and fasteners

Intake manifold

Intake manifold nuts and bolts
NA 1990–1997 (B6/BP)
14–19 ft·lb19–25 N·m19–25 N·m14–19 ft·lb
VTCS solenoid valve mounting nut (NB2)
NB 2001–2005 (BP-Z3); NB 2004–2005 (BP-Z3-TURBO)
79–112 in·lb in·lb8.9–12.7 N·m8.9–12.7 N·m79–112 in·lb in·lb
VTCS shutter valve actuator mounting bolts (NB2)
NB 2001–2005 (BP-Z3); NB 2004–2005 (BP-Z3-TURBO)
70–95 in·lb in·lb7.9–10.7 N·m7.9–10.7 N·m70–95 in·lb in·lb
Intake manifold to head nuts (NB2)
NB 2001–2005 (BP-Z3); NB 2004–2005 (BP-Z3-TURBO)
≈14–18 ft·lb19–25 N·m19–25 N·m≈14–18 ft·lb

Additional factory specifications

Factory service specifications (1999)

Additional 1994 service specifications

Throttle body & idle control

Turbocharger

Mazdaspeed turbo inlet hose clamp (NB2)
NB 2004–2005 (BP-Z3-TURBO, 6MT)
43 in·lb in·lb4.9 N·m4.9 N·m43 in·lb in·lb
Mazdaspeed air pipe No. 1 mounting bolt (NB2)
NB 2004–2005 (BP-Z3-TURBO, 6MT)
70–95 in·lb in·lb7.8–10.8 N·m7.8–10.8 N·m70–95 in·lb in·lb
Mazdaspeed air pipe No. 2 mounting bolt (NB2)
NB 2004–2005 (BP-Z3-TURBO, 6MT)
14–19 ft·lb18–26 N·m18–26 N·m14–19 ft·lb
Mazdaspeed air pipe No. 2 small mounting bolt (NB2)
NB 2004–2005 (BP-Z3-TURBO, 6MT)
70–95 in·lb in·lb7.8–10.8 N·m7.8–10.8 N·m70–95 in·lb in·lb
Mazdaspeed charge air cooler mounting bolts (NB2)
NB 2004–2005 (BP-Z3-TURBO, 6MT)
70–95 in·lb in·lb7.8–10.8 N·m7.8–10.8 N·m70–95 in·lb in·lb
Mazdaspeed charge air pipe mounting bolts and nuts (NB2)
NB 2004–2005 (BP-Z3-TURBO, 6MT)
70–95 in·lb in·lb7.8–10.8 N·m7.8–10.8 N·m70–95 in·lb in·lb
Turbocharger to exhaust manifold nuts (NB2)
NB 2004–2005 (BP-Z3-TURBO, 6MT)
28–34 ft·lb38.2–46.1 N·m38.2–46.1 N·m28–34 ft·lb
Turbocharger and outlet pipe heat shield fasteners (NB2)
NB 2004–2005 (BP-Z3-TURBO, 6MT)
70–95 in·lb in·lb7.8–10.8 N·m7.8–10.8 N·m70–95 in·lb in·lb

Fluids & capacities

Fluids & capacities

Service specs

Factory fuel-intake service audit

PCV valve directional airflow check (2001–2003)
NB 2003 (BP-Z3); NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware, test setup and connector perspective compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
Removed factory PCV valve: air applied at the wide cylindrical body end must flow through; air applied at the narrow hose nipple beyond the flange must not flow through.Removed factory PCV valve: air applied at the wide cylindrical body end must flow through; air applied at the narrow hose nipple beyond the flange must not flow through.
EVAP catch tank leakage check (2001–2005)
NB 2003–2005 (BP-Z3); NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware, test setup and connector perspective compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
With the removed EVAP catch tank’s purge-solenoid-side port plugged, blow through its charcoal-canister-side port; there must be no air leakage.With the removed EVAP catch tank’s purge-solenoid-side port plugged, blow through its charcoal-canister-side port; there must be no air leakage.
EVAP air filter airflow in both directions (2001–2003)
NB 2003 (BP-Z3); NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware, test setup and connector perspective compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
Removed EVAP air filter: air must pass from the canister-drain-cut-valve (CDCV) connection to the evaporative-chamber connection, and in the reverse direction.Removed EVAP air filter: air must pass from the canister-drain-cut-valve (CDCV) connection to the evaporative-chamber connection, and in the reverse direction.
Catalytic converter oxygen-sensor inversion test (2001–2003)
NB 2003 (BP-Z3); NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware, test setup and connector perspective compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
With no HO2S DTC detected, warm the front catalyst by driving 10 min at 65—96 km/h {40—60 mph}; then record O2S11/O2S12 for 1 min at idle. Count crossings of 0.5 V. Upstream crossings ÷ downstream crossings must be 2 or more; no downstream crossings also passes.With no HO2S DTC detected, warm the front catalyst by driving 10 min at 65—96 km/h {40—60 mph}; then record O2S11/O2S12 for 1 min at idle. Count crossings of 0.5 V. Upstream crossings ÷ downstream crossings must be 2 or more; no downstream crossings also passes.
Evaporative chamber airflow check (2001–2003)
NB 2003 (BP-Z3); NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware, test setup and connector perspective compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
Removed evaporative chamber: blow through its large hose neck and verify airflow from the pair of central openings in the perforated end face.Removed evaporative chamber: blow through its large hose neck and verify airflow from the pair of central openings in the perforated end face.
VTCS shutter actuator vacuum test (2001–2004)
NB 2003 (BP-Z3); NB 2004 (BP-Z3); NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware, test setup and connector perspective compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
Starts moving at approximately −9.3 kPa {−69.8 mmHg, −2.7 inHg}; fully pulled below −34.7 kPa {−260 mmHg, −10.2 inHg}; not pulled above −6.7 kPa {−51 mmHg, −2.0 inHg}.Starts moving at approximately −9.3 kPa {−69.8 mmHg, −2.7 inHg}; fully pulled below −34.7 kPa {−260 mmHg, −10.2 inHg}; not pulled above −6.7 kPa {−51 mmHg, −2.0 inHg}.
MAF and calculated-load scan references (2001–2004)
NB 2003 (BP-Z3); NB 2004 (BP-Z3); NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware and test setup compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
Idle at 750–850 rpm: MT 2.2–3.2 g/s and 15.0–23.0% load; AT 2.3–3.2 g/s and 14.0–23.0% load. At 2,500 rpm with no load, neutral or P: 6.5–8.5 g/s and 14.0–21.0% load.Idle at 750–850 rpm: MT 2.2–3.2 g/s and 15.0–23.0% load; AT 2.3–3.2 g/s and 14.0–23.0% load. At 2,500 rpm with no load, neutral or P: 6.5–8.5 g/s and 14.0–21.0% load.
EVAP purge-flow monitor operating conditions (2003)
NB 2003 (BP-Z3)
P0441 monitor: engine 1,100–2,700 rpm and throttle opening 11–25%.P0441 monitor: engine 1,100–2,700 rpm and throttle opening 11–25%.
EVAP leak-detection pump reference-orifice nominal hole (2003)
NB 2003 (BP-Z3)
Internal reference-orifice hole: 0.02 in (0.5 mm).Internal reference-orifice hole: 0.5 mm {0.02 in}.
Throttle-position performance detection conditions (2004 Mazdaspeed)
NB 2004 (BP-Z3-TURBO, 6MT)
P0121 stuck closed: throttle below 12.5% for 5 s, with ECT above 158 °F (70 °C) and MAF above 81 g/s {11 lb/min}. Stuck open: throttle above 50% for 5 s, with engine above 500 rpm and MAF below 5.3 g/s {0.70 lb/min}.P0121 stuck closed: throttle below 12.5% for 5 s, with ECT above 70°C {158°F} and MAF above 81 g/s {11 lb/min}. Stuck open: throttle above 50% for 5 s, with engine above 500 rpm and MAF below 5.3 g/s {0.70 lb/min}.
EVAP purge-flow monitor operating conditions (2004 Mazdaspeed)
NB 2004 (BP-Z3-TURBO, 6MT)
P0441 monitor conditions: engine 1,100–3,500 rpm; vehicle 34–119 km/h {21.1–73.7 mph}; throttle opening 5.5–14.5%.P0441 monitor conditions: engine 1,100–3,500 rpm; vehicle 34–119 km/h {21.1–73.7 mph}; throttle opening 5.5–14.5%.
Turbo wastegate regulating valve normal control conditions (2004)
NB 2004 (BP-Z3-TURBO, 6MT)
After engine warm-up, at 5,250 rpm or more, with throttle fully open.After engine warm-up, at 5,250 rpm or more, with throttle fully open.

Early NB2 factory service checks

Fuel injector O-ring installation (2001–2002)
NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware and test setup compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
Use new injector O-rings with a small amount of engine oil; keep sealing surfaces clean and insert with a light twisting motion to avoid folding the rings.Use new injector O-rings with a small amount of engine oil; keep sealing surfaces clean and insert with a light twisting motion to avoid folding the rings.
Fuel quick-release connector assembly (2001–2005)
NB 2001–2005 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware and test setup compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
Inspect and clean the fuel-pipe and connector interiors; push together until a click is heard, then pull by hand to confirm secure locking.Inspect and clean the fuel-pipe and connector interiors; push together until a click is heard, then pull by hand to confirm secure locking.

Early NB2 factory service checks

VTCS check/delay valve directional airflow — early NB2
NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware, test setup and connector perspective compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
Removed original VTCS check/delay valve: flow from the rounded wide-body end toward the tapered-body end; reverse flow blocked.Removed original VTCS check/delay valve: flow from the rounded wide-body end toward the tapered-body end; reverse flow blocked.
Purge solenoid airflow test — early NB2
NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware, test setup and connector perspective compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
Removed purge valve: no airflow between its hose ports when unpowered; with electrical A positive / B grounded, airflow passes.Removed purge valve: no airflow between its hose ports when unpowered; with electrical A positive / B grounded, airflow passes.

Service measurements and fasteners

Service measurements and fasteners

Fuel pump residual hold pressure (NB2, non-turbo)
NB 2001–2005 (BP-Z3) — Other years inferred from 2003 factory evidence.
More than 50 psi (343 kPa; 3.5 kgf/cm²) after 5 minMore than 343 kPa {3.5 kgf/cm², 50 psi} after 5 min

Factory service specifications (1999)

EVAP whole-system vacuum hold (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
Apply 1.7 kPa (13 mmHg, 0.5 inHg) vacuum; the specified reading must remain for at least two minutes.Apply 1.7 kPa (13 mmHg, 0.5 inHg) vacuum; the specified reading must remain for at least two minutes.
EVAP canister-to-tank vacuum hold (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
Apply 1.7 kPa (13 mmHg, 0.5 inHg) vacuum; the specified reading must remain for at least two minutes.Apply 1.7 kPa (13 mmHg, 0.5 inHg) vacuum; the specified reading must remain for at least two minutes.
EVAP canister-to-purge section vacuum hold (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
Apply 3.3 kPa (25 mmHg, 1.0 inHg) vacuum; the specified reading must remain for at least two minutes.Apply 3.3 kPa (25 mmHg, 1.0 inHg) vacuum; the specified reading must remain for at least two minutes.
Fuel-cut injector-duration test (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
During the specified deceleration: 0 msec injector duration; 2–5 msec when engine speed drops below 1,000 rpm.During the specified deceleration: 0 msec injector duration; 2–5 msec when engine speed drops below 1,000 rpm.
VICS shutter actuator vacuum test (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
Above −1.3 kPa {−10 mmHg, −0.4 inHg}: not pulled; −1.3—−4.0 kPa {−10—−30 mmHg, −0.4—−1.1 inHg}: starts moving; below −26 kPa {−190 mmHg, −7.5 inHg}: fully pulled.Above −1.3 kPa {−10 mmHg, −0.4 inHg}: not pulled; −1.3—−4.0 kPa {−10—−30 mmHg, −0.4—−1.1 inHg}: starts moving; below −26 kPa {−190 mmHg, −7.5 inHg}: fully pulled.
VICS solenoid valve airflow test (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
Unpowered: A–B terminal continuity and airflow between ports B–C. Battery positive on terminal A and ground on B: airflow between ports A–B.Unpowered: A–B terminal continuity and airflow between ports B–C. Battery positive on terminal A and ground on B: airflow between ports A–B.
Fuel pump relay continuity test (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
Unpowered: continuity A–B. Battery positive on A and ground on B: continuity C–E.Unpowered: continuity A–B. Battery positive on A and ground on B: continuity C–E.
Tank pressure control valve airflow test (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
Unpowered, pressure applied to port A: 0—+0.20 kPa {0—+1.47 mmHg, 0—+0.06 inHg}: no airflow; above +0.98 kPa {+7.36 mmHg, +0.29 inHg}: airflow; below −0.98 kPa {−7.36 mmHg, −0.29 inHg}: airflow. Powered terminal A positive/B ground: smooth airflow.Unpowered, pressure applied to port A: 0—+0.20 kPa {0—+1.47 mmHg, 0—+0.06 inHg}: no airflow; above +0.98 kPa {+7.36 mmHg, +0.29 inHg}: airflow; below −0.98 kPa {−7.36 mmHg, −0.29 inHg}: airflow. Powered terminal A positive/B ground: smooth airflow.
Canister drain-cut valve airflow test (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
Unpowered: terminal A–B continuity and airflow between ports A and B. Terminal A battery positive/B ground: no airflow between ports A and B.Unpowered: terminal A–B continuity and airflow between ports A and B. Terminal A battery positive/B ground: no airflow between ports A and B.
Purge solenoid airflow test (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
Unpowered: terminal A–B continuity, no airflow between ports A and B. Terminal A battery positive/B ground: airflow between ports A and B.Unpowered: terminal A–B continuity, no airflow between ports A and B. Terminal A battery positive/B ground: airflow between ports A and B.
EGR boost sensor solenoid airflow test (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
Unpowered: electrical A–B continuity; airflow between pneumatic B and C. Electrical A battery positive/B ground: airflow between pneumatic A and B.Unpowered: electrical A–B continuity; airflow between pneumatic B and C. Electrical A battery positive/B ground: airflow between pneumatic A and B.
Fuel-filler vent cut valve airflow inspection (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
Cap installed: air passes from rollover-valve connection to TPCV connection. Cap removed and internal filler-port lever depressed: air must not pass along that same path.Cap installed: air passes from rollover-valve connection to TPCV connection. Cap removed and internal filler-port lever depressed: air must not pass along that same path.

Factory service specifications (2003)

VTCS check/delay valve directional airflow (2003)
NB 2003 (BP-Z3)
Removed original valve: airflow from the rounded-body port A to the tapered-body port B; reverse flow blocked.Removed original valve: airflow from the rounded-body port A to the tapered-body port B; reverse flow blocked.
Intake manifold gasket orientation (2003)
NB 2003 (BP-Z3)
Factory intake manifold gasket: convex side faces the intake manifold.Factory intake manifold gasket: convex side faces the intake manifold.
Dynamic chamber gasket orientation (2003)
NB 2003 (BP-Z3)
Factory dynamic chamber gasket: convex side faces the intake manifold.Factory dynamic chamber gasket: convex side faces the intake manifold.
Dynamic chamber bracket tightening order (2003)
NB 2003 (BP-Z3)
After fitting the bracket bolts firmly, tighten the dynamic-chamber-side bolt before the fuel-distributor-side bolt.After fitting the bracket bolts firmly, tighten the dynamic-chamber-side bolt before the fuel-distributor-side bolt.
Fuel pump isolated continuity (2003)
NB 2003 (BP-Z3)
Continuity between pump terminals B and D.Continuity between pump terminals B and D.
Fuel drawing pump hose preparation (2003)
NB 2003 (BP-Z3)
Hose outer diameter 0.51 in (13 mm); length 85.0 in (2160 mm) or longer; illustrated inlet end cut at 30°.Hose outer diameter 13 mm {0.51 in}; length 2160 mm {85.0 in} or longer; illustrated inlet end cut at 30°.

Factory fuel and emission service specifications (2004)

Purge solenoid valve component resistance (2004)
NB 2004 (BP-Z3)
Between the disconnected valve’s component terminals: 22–26 ohms.Between the disconnected valve’s component terminals: 22–26 ohms.
EVAP canister-to-tank isolated vacuum retention (2004)
NB 2004 (BP-Z3)
Apply 1.7 kPa {13 mmHg, 0.5 inHg} vacuum to the disconnected hose; hold for at least 2 min.Apply 1.7 kPa {13 mmHg, 0.5 inHg} vacuum to the disconnected hose; hold for at least 2 min.
EVAP canister-to-purge isolated vacuum retention (2004)
NB 2004 (BP-Z3)
Apply 3.3 kPa {25 mmHg, 1.0 inHg} vacuum to the disconnected hose; hold for at least 2 min.Apply 3.3 kPa {25 mmHg, 1.0 inHg} vacuum to the disconnected hose; hold for at least 2 min.
Intake manifold vacuum at idle (2004)
NB 2004 (BP-Z3)
More than 60 kPa {450 mmHg, 18 inHg} vacuum at idle.More than 60 kPa {450 mmHg, 18 inHg} vacuum at idle.
Dynamic chamber bracket tightening order (2004–2005)
NB 2004–2005 (BP-Z3)
After fitting the bracket bolts firmly, tighten the dynamic-chamber-side bolt before the fuel-distributor-side bolt.After fitting the bracket bolts firmly, tighten the dynamic-chamber-side bolt before the fuel-distributor-side bolt.
Fuel pump isolated continuity (2004)
NB 2004 (BP-Z3)
Continuity between pump terminals B and D.Continuity between pump terminals B and D.
Fuel drawing pump hose preparation (2004)
NB 2004 (BP-Z3)
Hose outer diameter 0.51 in (13 mm); length 85.0 in (2160 mm) or longer; illustrated inlet end cut at 30°.Hose outer diameter 13 mm {0.51 in}; length 2160 mm {85.0 in} or longer; illustrated inlet end cut at 30°.
PCV valve directional airflow check (2004)
NB 2004 (BP-Z3)
Removed factory PCV valve: air applied at the wide cylindrical body end must flow through; air applied at the narrow hose nipple beyond the flange must not flow through.Removed factory PCV valve: air applied at the wide cylindrical body end must flow through; air applied at the narrow hose nipple beyond the flange must not flow through.
Evaporative chamber airflow check (2004–2005)
NB 2004–2005 (BP-Z3)
Removed evaporative chamber: blow through its large hose neck and verify airflow from the pair of central openings in the perforated end face.Removed evaporative chamber: blow through its large hose neck and verify airflow from the pair of central openings in the perforated end face.

Factory source validation additions (2005)

Factory service specifications

Fuel tank hose insertion depth (1990–1991)
NA 1990–1991 (B6) — 1990 applicability is supported by the cited 1990 factory pages; 1991 follows the owner-approved 1990-to-short-crank-1991 carry-over policy. No 1991 revision verification or long-crank applicability is claimed.
Main fuel, return and evaporation hoses at tank fittings at least 1.0 in (25 mm); filler hose at both pipes at least 1.4 in (35 mm).Main fuel, return and evaporation hoses at tank fittings at least 25 mm (1.0 in); filler hose at both pipes at least 35 mm (1.4 in).
Circuit-opening relay switching test (1990–1991)
NA 1990–1991 (B6) — 1990 applicability is supported by the cited 1990 factory pages; 1991 follows the owner-approved 1990-to-short-crank-1991 carry-over policy. No 1991 revision verification or long-crank applicability is claimed.
Apply 12 V to STA and ground E1 — B–Fp continuity; apply 12 V to B and ground Fc — Fp at battery voltage.Apply 12 V to STA and ground E1 — B–Fp continuity; apply 12 V to B and ground Fc — Fp at battery voltage.
Circuit-opening relay circuit voltage (1990–1991)
NA 1990–1991 (B6) — 1990 applicability is supported by the cited 1990 factory pages; 1991 follows the owner-approved 1990-to-short-crank-1991 carry-over policy. No 1991 revision verification or long-crank applicability is claimed.
Terminal order Fp, Fc, B, STA, E1: ignition ON — 0, 12, 12, 0, 0 V; START — 12, 0, 12, 12, 0 V; idle — 12, 0, 12, 0, 0 V.Terminal order Fp, Fc, B, STA, E1: ignition ON — 0, 12, 12, 0, 0 V; START — 12, 0, 12, 12, 0 V; idle — 12, 0, 12, 0, 0 V.
Two-way check valve vacuum test (1990–1991)
NA 1990–1991 (B6) — 1990 applicability is supported by the cited 1990 factory pages; 1991 follows the owner-approved 1990-to-short-crank-1991 carry-over policy. No 1991 revision verification or long-crank applicability is claimed.
Airflow at approximately 37 mmHg (1.46 inHg) vacuum at port A and approximately 44 mmHg (1.73 inHg) at port B.Airflow at approximately 37 mmHg (1.46 inHg) vacuum at port A and approximately 44 mmHg (1.73 inHg) at port B.
Purge solenoid airflow test (1990–1991)
NA 1990–1991 (B6) — 1990 applicability is supported by the cited 1990 factory pages; 1991 follows the owner-approved 1990-to-short-crank-1991 carry-over policy. No 1991 revision verification or long-crank applicability is claimed.
No airflow when unpowered; airflow with 12 V and ground applied to the disconnected solenoid terminals.No airflow when unpowered; airflow with 12 V and ground applied to the disconnected solenoid terminals.
Fuel tank hose insertion depth (1992–1993)
NA 1992–1993 (B6) — 1992 applicability is supported by the cited 1992 factory pages; 1993 follows the owner-approved 1992–1993 NA6 carry-over policy. No 1993 revision verification is claimed.
Main fuel, return and evaporation hoses at tank fittings at least 1.0 in (25 mm); filler hose at both pipes at least 1.4 in (35 mm).Main fuel, return and evaporation hoses at tank fittings at least 25 mm (1.0 in); filler hose at both pipes at least 35 mm (1.4 in).
Three-way check valve vacuum test (1992–1993 AT)
NA 1992–1993 (B6, 4AT) — 1992 applicability is supported by the cited 1992 factory pages; 1993 follows the owner-approved 1992–1993 NA6 carry-over policy. No 1993 revision verification is claimed.
Airflow at approximately 37 mmHg (1.46 inHg) vacuum at port A and approximately 70 mmHg (2.76 inHg) at port B, with port C plugged.Airflow at approximately 37 mmHg (1.46 inHg) vacuum at port A and approximately 70 mmHg (2.76 inHg) at port B, with port C plugged.