Updated specs are available.
Fuel & Intake
0 spec(s) here don't apply to your car.
No specs here apply to your Miata
Try a different system or check your car selection. Hidden values are for other cars; they are not substitutes for your factory manual.
Browse systemsTorque specs
Air cleaner
Air cleaner lower bracket bolt
NA 1990–1993 (B6)
14–19 ft·lb19–25 N·m19–25 N·m14–19 ft·lb
Air cleaner bracket bolt (intake duct side)
NA 1990–1993 (B6)
69–95 in·lb in·lb7.8–11 N·m7.8–11 N·m69–95 in·lb in·lb
Mass airflow sensor mounting bolts (NB2)
NB 2001–2005 (BP-Z3)
70–95 in·lb in·lb7.9–10.7 N·m7.9–10.7 N·m70–95 in·lb in·lb
Air intake hose clamps (NB2)
NB 2001–2005 (BP-Z3)
22–30 in·lb in·lb2.5–3.4 N·m2.5–3.4 N·m22–30 in·lb in·lb
Mazdaspeed mass airflow sensor mounting bolts (NB2)
NB 2004–2005 (BP-Z3-TURBO, 6MT)
70–95 in·lb in·lb7.8–10.8 N·m7.8–10.8 N·m70–95 in·lb in·lb
Mazdaspeed air intake hose clamps (NB2)
NB 2004–2005 (BP-Z3-TURBO, 6MT)
23–30 in·lb in·lb2.5–3.4 N·m2.5–3.4 N·m23–30 in·lb in·lb
Early NB2 factory service checks
Canister drain-cut valve mounting bolts — early NB2
NB 2001–2005 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware, test setup and connector perspective compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
70–104 in·lb in·lb7.9–11.7 N·m7.9–11.7 N·m70–104 in·lb in·lb
Emissions (EGR)
EGR valve bolts
NB 1999–2000 (BP-4W)
14–18 ft·lb19–25 N·m19–25 N·m14–18 ft·lb
EGR pipe flare nut
NB 1999–2000 (BP-4W)
24–34 ft·lb32–47 N·m32–47 N·m24–34 ft·lb
EGR pipe union at intake manifold (NB2)
NB 2001–2005 (BP-Z3)
24–34 ft·lb32–47 N·m32–47 N·m24–34 ft·lb
Mazdaspeed EGR pipe union at exhaust manifold (NB2)
NB 2004–2005 (BP-Z3-TURBO, 6MT)
24–34 ft·lb32–47 N·m32–47 N·m24–34 ft·lb
Mazdaspeed EGR pipe mounting bolts (NB2)
NB 2004–2005 (BP-Z3-TURBO, 6MT)
70–95 in·lb in·lb7.8–10.8 N·m7.8–10.8 N·m70–95 in·lb in·lb
Purge solenoid valve mounting nut (NB2)
NB 2001–2005 (BP-Z3); NB 2004–2005 (BP-Z3-TURBO)
79–112 in·lb in·lb8.9–12.7 N·m8.9–12.7 N·m79–112 in·lb in·lb
EGR valve mounting bolts (NB2)
NB 2001–2005 (BP-Z3); NB 2004–2005 (BP-Z3-TURBO)
14–18 ft·lb19–25 N·m19–25 N·m14–18 ft·lb
EGR pipe union at exhaust manifold (NB2)
NB 2001–2005 (BP-Z3)
≈24–35 ft·lb32–47 N·m32–47 N·m≈24–35 ft·lb
EGR pipe mounting bolts (NB2)
NB 2001–2005 (BP-Z3)
≈70–95 in·lb in·lb7.9–10.7 N·m7.9–10.7 N·m≈70–95 in·lb in·lb
Fuel rail & injectors
Fuel rail (delivery pipe) bolts
NA 1994–1997 (BP); NB 1999–2000 (BP-4W); NA 1990–1993 (B6)
14–18 ft·lb19–25 N·m19–25 N·m14–18 ft·lb
Fuel pressure regulator bolts
NA 1994–1997 (BP); NA 1990–1993 (B6)
70–95 in·lb in·lb7.9–10.7 N·m7.9–10.7 N·m70–95 in·lb in·lb
Fuel filter bracket bolt
NA 1994–1997 (BP); NB 1999–2000 (BP-4W); NA 1990–1993 (B6)
70–95 in·lb in·lb7.9–10.7 N·m7.9–10.7 N·m70–95 in·lb in·lb
Injector harness and bracket fasteners
NA 1990–1993 (B6)
69–95 in·lb in·lb7.8–11 N·m7.8–11 N·m69–95 in·lb in·lb
Fuel delivery rail mounting bolts (NB2)
NB 2001–2005 (BP-Z3); NB 2004–2005 (BP-Z3-TURBO)
14–18 ft·lb19–25 N·m19–25 N·m14–18 ft·lb
Fuel filter bracket mounting bolt (NB2)
NB 2001–2005 (BP-Z3); NB 2004–2005 (BP-Z3-TURBO)
70–95 in·lb in·lb7.9–10.7 N·m7.9–10.7 N·m70–95 in·lb in·lb
Fuel tank & pump
Fuel pump mounting screws
NB 1999–2000 (BP-4W)
10–19 in·lb in·lb1.1–2.1 N·m1.1–2.1 N·m10–19 in·lb in·lb
Fuel tank bracket bolts
NB 1999–2000 (BP-4W)
16–22 ft·lb22–30 N·m22–30 N·m16–22 ft·lb
Fuel filler neck bracket bolt
NA 1990–1993 (B6)
22–31 in·lb in·lb2.4–3.5 N·m2.4–3.5 N·m22–31 in·lb in·lb
Fuel pump lower mounting bracket screw (NB2)
NB 2004–2005 (BP-Z3); NB 2004–2005 (BP-Z3-TURBO)
25–37 in·lb in·lb2.8–4.2 N·m2.8–4.2 N·m25–37 in·lb in·lb
Fuel tank mounting bolts (NB2)
NB 2001–2005 (BP-Z3); NB 2004–2005 (BP-Z3-TURBO)
16–22 ft·lb22–30 N·m22–30 N·m16–22 ft·lb
Fuel tank protector mounting nuts (NB2)
NB 2001–2005 (BP-Z3); NB 2004–2005 (BP-Z3-TURBO)
79–112 in·lb in·lb8.9–12.7 N·m8.9–12.7 N·m79–112 in·lb in·lb
Fuel filler pipe upper mounting bolts (NB2)
NB 2001–2005 (BP-Z3); NB 2004–2005 (BP-Z3-TURBO)
22–31 in·lb in·lb2.5–3.5 N·m2.5–3.5 N·m22–31 in·lb in·lb
Fuel filler pipe lower bracket bolt (NB2)
NB 2001–2005 (BP-Z3); NB 2004–2005 (BP-Z3-TURBO)
79–112 in·lb in·lb8.9–12.7 N·m8.9–12.7 N·m79–112 in·lb in·lb
Fuel tank side bracket bolts (NB2)
NB 2001–2005 (BP-Z3); NB 2004–2005 (BP-Z3-TURBO)
70–104 in·lb in·lb7.9–11.7 N·m7.9–11.7 N·m70–104 in·lb in·lb
Fuel tank side bracket nut (NB2)
NB 2001–2005 (BP-Z3); NB 2004–2005 (BP-Z3-TURBO)
79–112 in·lb in·lb8.9–12.7 N·m8.9–12.7 N·m79–112 in·lb in·lb
Fuel pump lower mounting bracket screw (2001–03)
NB 2001 (BP-Z3) — 2001 follows the 2002 (1719-1U-01G) manual, the nearest edition; no 2001 manual was checked.; NB 2002–2003 (BP-Z3)
70–95 in·lb in·lb7.9–10.7 N·m7.9–10.7 N·m70–95 in·lb in·lb
Service measurements and fasteners
Intake manifold bracket bolts (NA6)
NA 1990–1993 (B6) — Other years inferred from 1990 factory evidence.
27–40 ft·lb36–54 N·m36–54 N·m27–40 ft·lb
Intake manifold
Intake manifold nuts and bolts
NA 1990–1997 (B6/BP)
14–19 ft·lb19–25 N·m19–25 N·m14–19 ft·lb
Intake manifold bracket bolts (NA 1.8)
NA 1994–1997 (BP) — Other years inferred from 1994 factory evidence.
28–38 ft·lb38–51 N·m38–51 N·m28–38 ft·lb
Intake manifold support bracket upper bolts (NB2)
NB 2001–2005 (BP-Z3); NB 2004–2005 (BP-Z3-TURBO)
28–38 ft·lb38–51 N·m38–51 N·m28–38 ft·lb
VTCS solenoid valve mounting nut (NB2)
NB 2001–2005 (BP-Z3); NB 2004–2005 (BP-Z3-TURBO)
79–112 in·lb in·lb8.9–12.7 N·m8.9–12.7 N·m79–112 in·lb in·lb
VTCS shutter valve actuator mounting bolts (NB2)
NB 2001–2005 (BP-Z3); NB 2004–2005 (BP-Z3-TURBO)
70–95 in·lb in·lb7.9–10.7 N·m7.9–10.7 N·m70–95 in·lb in·lb
Intake manifold to head nuts (NB2)
NB 2001–2005 (BP-Z3); NB 2004–2005 (BP-Z3-TURBO)
≈14–18 ft·lb19–25 N·m19–25 N·m≈14–18 ft·lb
Intake manifold upper section bolts (NB2)
NB 2001–2005 (BP-Z3); NB 2004–2005 (BP-Z3-TURBO)
≈14–18 ft·lb19–25 N·m19–25 N·m≈14–18 ft·lb
Additional factory specifications
Accelerator cable bracket bolts (NB1)
NB 1999–2000 (BP-4W) — 2000 applicability inferred from 1999 factory evidence within the NB1 year group.
70–95 in·lb in·lb7.9–10.7 N·m7.9–10.7 N·m70–95 in·lb in·lb
Dynamic chamber bracket bolts (NB1)
NB 1999–2000 (BP-4W) — 2000 applicability inferred from 1999 factory evidence within the NB1 year group.
70–95 in·lb in·lb7.9–10.7 N·m7.9–10.7 N·m70–95 in·lb in·lb
EGR pipe flange bolts at dynamic chamber (NB1)
NB 1999–2000 (BP-4W) — 2000 applicability inferred from 1999 factory evidence within the NB1 year group.
70–95 in·lb in·lb7.9–10.7 N·m7.9–10.7 N·m70–95 in·lb in·lb
Intake air hose clamps (NB1)
NB 1999–2000 (BP-4W) — 2000 applicability inferred from 1999 factory evidence within the NB1 year group.
22–30 in·lb in·lb2.5–3.4 N·m2.5–3.4 N·m22–30 in·lb in·lb
Air cleaner mounting nuts (NB1)
NB 1999–2000 (BP-4W) — 2000 applicability inferred from 1999 factory evidence within the NB1 year group.
14–16 ft·lb19–22 N·m19–22 N·m14–16 ft·lb
Fresh-air duct mounting bolt (NB1)
NB 1999–2000 (BP-4W) — 2000 applicability inferred from 1999 factory evidence within the NB1 year group.
70–104 in·lb in·lb7.9–11.7 N·m7.9–11.7 N·m70–104 in·lb in·lb
Mass air flow sensor mounting bolts (NB1)
NB 1999–2000 (BP-4W) — 2000 applicability inferred from 1999 factory evidence within the NB1 year group.
70–95 in·lb in·lb7.9–10.7 N·m7.9–10.7 N·m70–95 in·lb in·lb
Dynamic chamber stay bolts — dynamic chamber side (NB1)
NB 1999–2000 (BP-4W) — 2000 applicability inferred from 1999 factory evidence within the NB1 year group.
14–18 ft·lb19–25 N·m19–25 N·m14–18 ft·lb
Dynamic chamber stay bolt — intake manifold side (NB1)
NB 1999–2000 (BP-4W) — 2000 applicability inferred from 1999 factory evidence within the NB1 year group.
28–38 ft·lb38–51 N·m38–51 N·m28–38 ft·lb
Fuel distributor bracket bolt (NB1)
NB 1999–2000 (BP-4W) — 2000 applicability inferred from 1999 factory evidence within the NB1 year group.
70–95 in·lb in·lb7.9–10.7 N·m7.9–10.7 N·m70–95 in·lb in·lb
Pulsation damper No. 2 nuts (NB1)
NB 1999–2000 (BP-4W) — 2000 applicability inferred from 1999 factory evidence within the NB1 year group.
70–95 in·lb in·lb7.9–10.7 N·m7.9–10.7 N·m70–95 in·lb in·lb
Pulsation damper No. 1 mounting bolt (NB1)
NB 1999–2000 (BP-4W) — 2000 applicability inferred from 1999 factory evidence within the NB1 year group.
70–95 in·lb in·lb7.9–10.7 N·m7.9–10.7 N·m70–95 in·lb in·lb
Fuel tank service hole cover bolts (NB1)
NB 1999–2000 (BP-4W) — 2000 applicability inferred from 1999 factory evidence within the NB1 year group.
79–112 in·lb in·lb8.9–12.7 N·m8.9–12.7 N·m79–112 in·lb in·lb
Fuel tank insulator mounting nuts (NB1)
NB 1999–2000 (BP-4W) — 2000 applicability inferred from 1999 factory evidence within the NB1 year group.
79–112 in·lb in·lb8.9–12.7 N·m8.9–12.7 N·m79–112 in·lb in·lb
Charcoal canister mounting nuts (NB1)
NB 1999–2000 (BP-4W) — 2000 applicability inferred from 1999 factory evidence within the NB1 year group.
79–112 in·lb in·lb8.9–12.7 N·m8.9–12.7 N·m79–112 in·lb in·lb
Fuel filler pipe upper mounting bolts (NB1)
NB 1999–2000 (BP-4W) — 2000 applicability inferred from 1999 factory evidence within the NB1 year group.
22–31 in·lb in·lb2.5–3.5 N·m2.5–3.5 N·m22–31 in·lb in·lb
Fuel filler pipe lower mounting bolts (NB1)
NB 1999–2000 (BP-4W) — 2000 applicability inferred from 1999 factory evidence within the NB1 year group.
79–112 in·lb in·lb8.9–12.7 N·m8.9–12.7 N·m79–112 in·lb in·lb
Fuel pipe dust cover bolts (NB1)
NB 1999–2000 (BP-4W) — 2000 applicability inferred from 1999 factory evidence within the NB1 year group.
70–104 in·lb in·lb7.9–11.7 N·m7.9–11.7 N·m70–104 in·lb in·lb
Factory service specifications (1999)
VICS shutter valve actuator mounting bolts (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
70–95 in·lb in·lb7.9–10.7 N·m7.9–10.7 N·m70–95 in·lb in·lb
VICS solenoid mounting nut (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
78–112 in·lb in·lb8.9–12.7 N·m8.9–12.7 N·m78–112 in·lb in·lb
Accelerator cable adjusting locknuts (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
7–10 ft·lb9.8–14 N·m9.8–14 N·m7–10 ft·lb
Fuel pump lower retaining bracket bolt (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
70–95 in·lb in·lb7.9–10.7 N·m7.9–10.7 N·m70–95 in·lb in·lb
High-pressure fuel filter band clamp bolt (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
36–52 in·lb in·lb4.1–5.8 N·m4.1–5.8 N·m36–52 in·lb in·lb
Fuel tank rollover valve mounting bolts (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
10–19 in·lb in·lb1.1–2.1 N·m1.1–2.1 N·m10–19 in·lb in·lb
Canister drain-cut valve mounting bolts (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
70–104 in·lb in·lb7.9–11.7 N·m7.9–11.7 N·m70–104 in·lb in·lb
Purge solenoid mounting nut (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
79–112 in·lb in·lb8.9–12.7 N·m8.9–12.7 N·m79–112 in·lb in·lb
Accelerator cable bulkhead mounting bolts (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
70–95 in·lb in·lb7.9–10.7 N·m7.9–10.7 N·m70–95 in·lb in·lb
Additional 1994 service specifications
Injector harness and bracket fasteners (NA 1.8)
NA 1994–1997 (BP) — 1995–1997 applicability inferred from 1994 within the year group.
70–95 in·lb in·lb7.9–10.7 N·m7.9–10.7 N·m70–95 in·lb in·lb
Throttle body & idle control
Throttle body bolts and nuts
NA 1994–1997 (BP); NB 1999–2000 (BP-4W); NA 1990–1993 (B6)
14–18 ft·lb19–25 N·m19–25 N·m14–18 ft·lb
Idle air control valve bolts
NB 1999–2000 (BP-4W)
39–57 in·lb in·lb4.3–6.5 N·m4.3–6.5 N·m39–57 in·lb in·lb
Accelerator cable adjusting locknuts (NB2)
NB 2001–2005 (BP-Z3); NB 2004–2005 (BP-Z3-TURBO)
7–10 ft·lb9.9–14 N·m9.9–14 N·m7–10 ft·lb
Throttle body mounting bolts and nuts (NB2)
NB 2001–2005 (BP-Z3); NB 2004–2005 (BP-Z3-TURBO)
14–18 ft·lb19–25 N·m19–25 N·m14–18 ft·lb
Idle air control valve screws (NB2)
NB 2001–2005 (BP-Z3); NB 2004–2005 (BP-Z3-TURBO)
39–57 in·lb in·lb4.3–6.5 N·m4.3–6.5 N·m39–57 in·lb in·lb
Accelerator cable firewall bracket bolts (NB2)
NB 2001–2005 (BP-Z3); NB 2004–2005 (BP-Z3-TURBO)
70–95 in·lb in·lb7.9–10.7 N·m7.9–10.7 N·m70–95 in·lb in·lb
Turbocharger
Mazdaspeed turbo inlet hose clamp (NB2)
NB 2004–2005 (BP-Z3-TURBO, 6MT)
43 in·lb in·lb4.9 N·m4.9 N·m43 in·lb in·lb
Mazdaspeed air pipe No. 1 mounting bolt (NB2)
NB 2004–2005 (BP-Z3-TURBO, 6MT)
70–95 in·lb in·lb7.8–10.8 N·m7.8–10.8 N·m70–95 in·lb in·lb
Mazdaspeed air pipe No. 2 mounting bolt (NB2)
NB 2004–2005 (BP-Z3-TURBO, 6MT)
14–19 ft·lb18–26 N·m18–26 N·m14–19 ft·lb
Mazdaspeed air pipe No. 2 small mounting bolt (NB2)
NB 2004–2005 (BP-Z3-TURBO, 6MT)
70–95 in·lb in·lb7.8–10.8 N·m7.8–10.8 N·m70–95 in·lb in·lb
Mazdaspeed charge air cooler mounting bolts (NB2)
NB 2004–2005 (BP-Z3-TURBO, 6MT)
70–95 in·lb in·lb7.8–10.8 N·m7.8–10.8 N·m70–95 in·lb in·lb
Mazdaspeed charge air pipe mounting bolts and nuts (NB2)
NB 2004–2005 (BP-Z3-TURBO, 6MT)
70–95 in·lb in·lb7.8–10.8 N·m7.8–10.8 N·m70–95 in·lb in·lb
Turbocharger to exhaust manifold nuts (NB2)
NB 2004–2005 (BP-Z3-TURBO, 6MT)
28–34 ft·lb38.2–46.1 N·m38.2–46.1 N·m28–34 ft·lb
Turbocharger and outlet pipe heat shield fasteners (NB2)
NB 2004–2005 (BP-Z3-TURBO, 6MT)
70–95 in·lb in·lb7.8–10.8 N·m7.8–10.8 N·m70–95 in·lb in·lb
Fluids & capacities
Fluids & capacities
Fuel tank capacity (NA6)
NA 1990–1993 (B6) — Other years inferred from 1990 factory evidence.
11.9 US gal45 L45 L11.9 US gal
Service specs
Factory fuel-intake service audit
Fuel system residual pressure after shutdown (1990–1993)
NA 1992–1993 (B6) — 1992 applicability is supported by the cited 1992 factory pages; 1993 follows the owner-approved 1992–1993 NA6 carry-over policy. No 1993 revision verification is claimed.; NA 1990–1991 (B6) — 1990 applicability is supported by the cited 1990 factory pages; 1991 follows the owner-approved 1990-to-short-crank-1991 carry-over policy. No 1991 revision verification or long-crank applicability is claimed.
More than 21 psi (147 kPa; 1.5 kg/cm²) after 5 minMore than 147 kPa (1.5 kg/cm², 21 psi) after 5 min
Fuel pump isolated hold pressure (1990–1993)
NA 1992–1993 (B6) — 1992 applicability is supported by the cited 1992 factory pages; 1993 follows the owner-approved 1992–1993 NA6 carry-over policy. No 1993 revision verification is claimed.; NA 1990–1991 (B6) — 1990 applicability is supported by the cited 1990 factory pages; 1991 follows the owner-approved 1990-to-short-crank-1991 carry-over policy. No 1991 revision verification or long-crank applicability is claimed.
More than 50 psi (343 kPa; 3.5 kg/cm²) after 5 minMore than 343 kPa (3.5 kg/cm², 50 psi) after 5 min
Fuel pressure regulator isolation hold test (1990–1993)
NA 1992–1993 (B6) — 1992 applicability is supported by the cited 1992 factory pages; 1993 follows the owner-approved 1992–1993 NA6 carry-over policy. No 1993 revision verification is claimed.; NA 1990–1991 (B6) — 1990 applicability is supported by the cited 1990 factory pages; 1991 follows the owner-approved 1990-to-short-crank-1991 carry-over policy. No 1991 revision verification or long-crank applicability is claimed.
More than 21 psi (147 kPa; 1.5 kg/cm²) for 5 min with regulator outlet blockedMore than 147 kPa (1.5 kg/cm², 21 psi) for 5 min with regulator outlet blocked
Circuit-opening relay resistance (1990–1993)
NA 1992–1993 (B6) — 1992 applicability is supported by the cited 1992 factory pages; 1993 follows the owner-approved 1992–1993 NA6 carry-over policy. No 1993 revision verification is claimed.; NA 1990–1991 (B6) — 1990 applicability is supported by the cited 1990 factory pages; 1991 follows the owner-approved 1990-to-short-crank-1991 carry-over policy. No 1991 revision verification or long-crank applicability is claimed.
STA–E1: 21–43 Ω; B–Fc: 109–226 Ω; B–Fp: infinite resistance.STA–E1: 21–43 Ω; B–Fc: 109–226 Ω; B–Fp: infinite resistance.
Airflow meter fuel-pump switch resistance (1990–1993)
NA 1992–1993 (B6) — 1992 applicability is supported by the cited 1992 factory pages; 1993 follows the owner-approved 1992–1993 NA6 carry-over policy. No 1993 revision verification is claimed.; NA 1990–1991 (B6) — 1990 applicability is supported by the cited 1990 factory pages; 1991 follows the owner-approved 1990-to-short-crank-1991 carry-over policy. No 1991 revision verification or long-crank applicability is claimed.
E1–Fc: infinite resistance fully closed; 0 Ω fully open.E1–Fc: infinite resistance fully closed; 0 Ω fully open.
Fuel line pressure at idle and acceleration (2001–2004)
NB 2003 (BP-Z3); NB 2004 (BP-Z3); NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware, test setup and connector perspective compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
53–61 psi (370–420 kPa; 3.7–4.3 kgf/cm²)370–420 kPa (3.7–4.3 kgf/cm², 53–61 psi)
Fuel system residual pressure after shutdown (2001–2004)
NB 2003 (BP-Z3); NB 2004 (BP-Z3); NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware, test setup and connector perspective compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
More than 36.3 psi (250 kPa; 2.55 kgf/cm²) after 5 minMore than 250 kPa (2.55 kgf/cm², 36.3 psi) after 5 min
Cold-idle air valve warm-up inspection (1990–1993)
NA 1992–1993 (B6) — 1992 applicability is supported by the cited 1992 factory pages; 1993 follows the owner-approved 1992–1993 NA6 carry-over policy. No 1993 revision verification is claimed.; NA 1990–1991 (B6) — 1990 applicability is supported by the cited 1990 factory pages; 1991 follows the owner-approved 1990-to-short-crank-1991 carry-over policy. No 1991 revision verification or long-crank applicability is claimed.
Begin below 68 °F (20 °C) coolant temperature; engine speed must gradually decrease during warm-up.Begin below 20°C (68°F) coolant temperature; engine speed must gradually decrease during warm-up.
ISC valve disconnect response at warm idle (1990–1993)
NA 1992–1993 (B6) — 1992 applicability is supported by the cited 1992 factory pages; 1993 follows the owner-approved 1992–1993 NA6 carry-over policy. No 1993 revision verification is claimed.; NA 1990–1991 (B6) — 1990 applicability is supported by the cited 1990 factory pages; 1991 follows the owner-approved 1990-to-short-crank-1991 carry-over policy. No 1991 revision verification or long-crank applicability is claimed.
At normal warm idle, disconnect the black two-pin ISC connector: valve clicks and speed rises to approximately 1,200 rpm.At normal warm idle, disconnect the black two-pin ISC connector: valve clicks and speed rises to approximately 1,200 rpm.
PCV valve directional airflow check (2001–2003)
NB 2003 (BP-Z3); NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware, test setup and connector perspective compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
Removed factory PCV valve: air applied at the wide cylindrical body end must flow through; air applied at the narrow hose nipple beyond the flange must not flow through.Removed factory PCV valve: air applied at the wide cylindrical body end must flow through; air applied at the narrow hose nipple beyond the flange must not flow through.
EVAP catch tank leakage check (2001–2005)
NB 2003–2005 (BP-Z3); NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware, test setup and connector perspective compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
With the removed EVAP catch tank’s purge-solenoid-side port plugged, blow through its charcoal-canister-side port; there must be no air leakage.With the removed EVAP catch tank’s purge-solenoid-side port plugged, blow through its charcoal-canister-side port; there must be no air leakage.
EVAP air filter airflow in both directions (2001–2003)
NB 2003 (BP-Z3); NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware, test setup and connector perspective compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
Removed EVAP air filter: air must pass from the canister-drain-cut-valve (CDCV) connection to the evaporative-chamber connection, and in the reverse direction.Removed EVAP air filter: air must pass from the canister-drain-cut-valve (CDCV) connection to the evaporative-chamber connection, and in the reverse direction.
Catalytic converter oxygen-sensor inversion test (2001–2003)
NB 2003 (BP-Z3); NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware, test setup and connector perspective compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
With no HO2S DTC detected, warm the front catalyst by driving 10 min at 65—96 km/h {40—60 mph}; then record O2S11/O2S12 for 1 min at idle. Count crossings of 0.5 V. Upstream crossings ÷ downstream crossings must be 2 or more; no downstream crossings also passes.With no HO2S DTC detected, warm the front catalyst by driving 10 min at 65—96 km/h {40—60 mph}; then record O2S11/O2S12 for 1 min at idle. Count crossings of 0.5 V. Upstream crossings ÷ downstream crossings must be 2 or more; no downstream crossings also passes.
Evaporative chamber airflow check (2001–2003)
NB 2003 (BP-Z3); NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware, test setup and connector perspective compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
Removed evaporative chamber: blow through its large hose neck and verify airflow from the pair of central openings in the perforated end face.Removed evaporative chamber: blow through its large hose neck and verify airflow from the pair of central openings in the perforated end face.
Idle speed inspection interval — U.S. schedules (2001–2003)
NB 2003 — U.S.A. Schedule 1 normal driving or Schedule 2 unique driving conditions, as stated. Non-U.S. market applicability is not established here.; NB 2001–2002 — U.S.A. Schedule 1 normal driving or Schedule 2 unique driving conditions, as stated. Non-U.S. market applicability is not established here. 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with the applicable factory schedule, facts and service context compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
Schedules 1 and 2: inspect every 24 months or 48,000 kilometers (30,000 miles), whichever comes first.Schedules 1 and 2: inspect every 24 months or 48,000 kilometers (30,000 miles), whichever comes first.
Fuel line and hose inspection interval — U.S. schedules (2001–2003)
NB 2003 — U.S.A. Schedule 1 normal driving or Schedule 2 unique driving conditions, as stated. Non-U.S. market applicability is not established here.; NB 2001–2002 — U.S.A. Schedule 1 normal driving or Schedule 2 unique driving conditions, as stated. Non-U.S. market applicability is not established here. 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with the applicable factory schedule, facts and service context compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
Schedules 1 and 2: inspect every 24 months or 48,000 kilometers (30,000 miles), whichever comes first.Schedules 1 and 2: inspect every 24 months or 48,000 kilometers (30,000 miles), whichever comes first.
Emission hose and tube inspection interval — U.S. schedules (2001–2003)
NB 2003 — U.S.A. Schedules 1 and 2 only.; NB 2001–2002 — U.S.A. Schedules 1 and 2 only. 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with the applicable factory schedule, facts and service context compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
Schedules 1 and 2: inspect at 48 months or 96,000 kilometers (60,000 miles), whichever comes first; continue the recommended interval thereafter.Schedules 1 and 2: inspect at 48 months or 96,000 kilometers (60,000 miles), whichever comes first; continue the recommended interval thereafter.
VTCS shutter actuator vacuum test (2001–2004)
NB 2003 (BP-Z3); NB 2004 (BP-Z3); NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware, test setup and connector perspective compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
Starts moving at approximately −9.3 kPa {−69.8 mmHg, −2.7 inHg}; fully pulled below −34.7 kPa {−260 mmHg, −10.2 inHg}; not pulled above −6.7 kPa {−51 mmHg, −2.0 inHg}.Starts moving at approximately −9.3 kPa {−69.8 mmHg, −2.7 inHg}; fully pulled below −34.7 kPa {−260 mmHg, −10.2 inHg}; not pulled above −6.7 kPa {−51 mmHg, −2.0 inHg}.
Idle-air-control valve winding resistance (2001–2004)
NB 2003 (BP-Z3); NB 2004 (BP-Z3); NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware, test setup and connector perspective compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
8.7–10.5 Ω at 75 °F (24 °C)8.7–10.5 Ω at 24°C {75°F}
EGR valve stepper-coil resistance (2001–2004)
NB 2003 (BP-Z3); NB 2004 (BP-Z3); NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware, test setup and connector perspective compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
Approximately 20–24 Ω for each pair: C–E, C–A, D–B and D–F.Approximately 20–24 Ω for each pair: C–E, C–A, D–B and D–F.
MAF and calculated-load scan references (2001–2004)
NB 2003 (BP-Z3); NB 2004 (BP-Z3); NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware and test setup compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
Idle at 750–850 rpm: MT 2.2–3.2 g/s and 15.0–23.0% load; AT 2.3–3.2 g/s and 14.0–23.0% load. At 2,500 rpm with no load, neutral or P: 6.5–8.5 g/s and 14.0–21.0% load.Idle at 750–850 rpm: MT 2.2–3.2 g/s and 15.0–23.0% load; AT 2.3–3.2 g/s and 14.0–23.0% load. At 2,500 rpm with no load, neutral or P: 6.5–8.5 g/s and 14.0–21.0% load.
EVAP purge-flow monitor operating conditions (2003)
NB 2003 (BP-Z3)
P0441 monitor: engine 1,100–2,700 rpm and throttle opening 11–25%.P0441 monitor: engine 1,100–2,700 rpm and throttle opening 11–25%.
EVAP leak-detection pump reference-orifice nominal hole (2003)
NB 2003 (BP-Z3)
Internal reference-orifice hole: 0.02 in (0.5 mm).Internal reference-orifice hole: 0.5 mm {0.02 in}.
Throttle-position performance detection conditions (2004 Mazdaspeed)
NB 2004 (BP-Z3-TURBO, 6MT)
P0121 stuck closed: throttle below 12.5% for 5 s, with ECT above 158 °F (70 °C) and MAF above 81 g/s {11 lb/min}. Stuck open: throttle above 50% for 5 s, with engine above 500 rpm and MAF below 5.3 g/s {0.70 lb/min}.P0121 stuck closed: throttle below 12.5% for 5 s, with ECT above 70°C {158°F} and MAF above 81 g/s {11 lb/min}. Stuck open: throttle above 50% for 5 s, with engine above 500 rpm and MAF below 5.3 g/s {0.70 lb/min}.
EVAP purge-flow monitor operating conditions (2004 Mazdaspeed)
NB 2004 (BP-Z3-TURBO, 6MT)
P0441 monitor conditions: engine 1,100–3,500 rpm; vehicle 34–119 km/h {21.1–73.7 mph}; throttle opening 5.5–14.5%.P0441 monitor conditions: engine 1,100–3,500 rpm; vehicle 34–119 km/h {21.1–73.7 mph}; throttle opening 5.5–14.5%.
Turbo wastegate regulating valve normal control conditions (2004)
NB 2004 (BP-Z3-TURBO, 6MT)
After engine warm-up, at 5,250 rpm or more, with throttle fully open.After engine warm-up, at 5,250 rpm or more, with throttle fully open.
Early NB2 factory service checks
Intake manifold gasket orientation (2001–2002)
NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware and test setup compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
Factory intake manifold gasket: convex side faces the intake manifold.Factory intake manifold gasket: convex side faces the intake manifold.
Dynamic chamber gasket orientation (2001–2002)
NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware and test setup compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
Factory dynamic chamber gasket: convex side faces the intake manifold.Factory dynamic chamber gasket: convex side faces the intake manifold.
Dynamic chamber bracket tightening order (2001–2002)
NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware and test setup compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
After fitting the bracket bolts firmly, tighten the dynamic-chamber-side bolt before the fuel-distributor-side bolt.After fitting the bracket bolts firmly, tighten the dynamic-chamber-side bolt before the fuel-distributor-side bolt.
Fuel injector O-ring installation (2001–2002)
NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware and test setup compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
Use new injector O-rings with a small amount of engine oil; keep sealing surfaces clean and insert with a light twisting motion to avoid folding the rings.Use new injector O-rings with a small amount of engine oil; keep sealing surfaces clean and insert with a light twisting motion to avoid folding the rings.
Fuel quick-release connector assembly (2001–2005)
NB 2001–2005 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware and test setup compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
Inspect and clean the fuel-pipe and connector interiors; push together until a click is heard, then pull by hand to confirm secure locking.Inspect and clean the fuel-pipe and connector interiors; push together until a click is heard, then pull by hand to confirm secure locking.
Fuel pump seating in bracket (2001–2005)
NB 2001–2005 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware and test setup compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
After fitting the pump, pull it downward until it sits flush against the lower bracket with no gap.After fitting the pump, pull it downward until it sits flush against the lower bracket with no gap.
Early NB2 factory service checks
VTCS check/delay valve directional airflow — early NB2
NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware, test setup and connector perspective compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
Removed original VTCS check/delay valve: flow from the rounded wide-body end toward the tapered-body end; reverse flow blocked.Removed original VTCS check/delay valve: flow from the rounded wide-body end toward the tapered-body end; reverse flow blocked.
Canister drain-cut valve airflow test — early NB2
NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware, test setup and connector perspective compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
Removed CDCV: airflow between its two hose ports when unpowered; with electrical A positive / B grounded, airflow blocked.Removed CDCV: airflow between its two hose ports when unpowered; with electrical A positive / B grounded, airflow blocked.
Purge solenoid airflow test — early NB2
NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware, test setup and connector perspective compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
Removed purge valve: no airflow between its hose ports when unpowered; with electrical A positive / B grounded, airflow passes.Removed purge valve: no airflow between its hose ports when unpowered; with electrical A positive / B grounded, airflow passes.
Canister drain-cut valve hose seating — early NB2
NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware, test setup and connector perspective compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
Seat the canister drain-cut valve’s evaporative hose against its stopper.Seat the canister drain-cut valve’s evaporative hose against its stopper.
Service measurements and fasteners
Engine idle speed — adjustment condition (NA6)
NA 1990–1993 (B6, 5MT) — 1991 follows the 1990 manual and 1993 follows the 1992 manual, the nearest editions; no 1991 or 1993 manual was checked.
850 ± 50 rpm (Neutral)850 ± 50 rpm (Neutral)
Accelerator cable free play (NA6)
NA 1990–1993 (B6) — Other years inferred from 1990 factory evidence.
0.039–0.118 in (1–3 mm)1–3 mm (0.039–0.118 in)
Fuel injector resistance (NA6)
NA 1990–1993 (B6) — Other years inferred from 1990 factory evidence.
12–16 (at ≈68 °F (20°C), 68°F) Ω12–16 (at 20°C, 68°F) Ω
ISC valve solenoid resistance (NA6)
NA 1990–1993 (B6) — Other years inferred from 1990 factory evidence.
11–13 (at ≈68 °F (20°C), 68°F) Ω11–13 (at 20°C, 68°F) Ω
Fuel line pressure — engine off, pump operating (NA6)
NA 1990–1993 (B6) — Other years inferred from 1990 factory evidence.
38–46 psi (265–314 kPa; 2.7–3.2 kg/cm²)265–314 kPa (2.7–3.2 kg/cm², 38–46 psi)
Fuel line pressure — engine idling (NA6)
NA 1990–1993 (B6) — Other years inferred from 1990 factory evidence.
31–38 psi (216–265 kPa; 2.2–2.7 kg/cm²)216–265 kPa (2.2–2.7 kg/cm², 31–38 psi)
Service measurements and fasteners
Fuel injector resistance (NB2, non-turbo)
NB 2001–2005 (BP-Z3) — Other years inferred from 2003 factory evidence.
12–13 ohms at 68 °F (20 °C)12–13 ohms at 20°C {68°F}
Fuel injector leakage limit (NB2, non-turbo)
NB 2001–2005 (BP-Z3) — Other years inferred from 2003 factory evidence.
Less than 1 drop in 2 minLess than 1 drop in 2 min
Fuel pump residual hold pressure (NB2, non-turbo)
NB 2001–2005 (BP-Z3) — Other years inferred from 2003 factory evidence.
More than 50 psi (343 kPa; 3.5 kgf/cm²) after 5 minMore than 343 kPa {3.5 kgf/cm², 50 psi} after 5 min
Idle-up speed — electrical loads, manual transmission (NB2 non-turbo)
NB 2001–2005 (BP-Z3, 5MT/6MT) — Other years inferred within NB2 non-turbo family from actual 2003/2005 factory evidence.
750–850 rpm (800 ± 50 rpm)750–850 rpm (800 ± 50 rpm)
Idle-up speed — electrical loads (Mazdaspeed)
NB 2004–2005 (BP-Z3-TURBO, 6MT) — Actual2005 factory evidence; 2004 inferred within MSM family.
800–900 rpm (850 ± 50 rpm)800–900 rpm (850 ± 50 rpm)
Idle-up speed — power steering, manual transmission (NB2 and Mazdaspeed)
NB 2001–2005 (BP-Z3, 5MT/6MT) — Other years inferred within NB2 non-turbo family from actual 2003/2005 factory evidence.; NB 2004–2005 (BP-Z3-TURBO, 6MT) — Actual2005 factory evidence; 2004 inferred within MSM family.
750–850 rpm (800 ± 50 rpm)750–850 rpm (800 ± 50 rpm)
Idle-up speed — A/C, manual transmission (NB2 and Mazdaspeed)
NB 2001–2005 (BP-Z3, 5MT/6MT) — Other years inferred within NB2 non-turbo family from actual 2003/2005 factory evidence.; NB 2004–2005 (BP-Z3-TURBO, 6MT) — Actual2005 factory evidence; 2004 inferred within MSM family.
950–1050 rpm (1000 ± 50 rpm)950–1050 rpm (1000 ± 50 rpm)
Idle-up speed — automatic in Neutral or Park (NB2 non-turbo)
NB 2001–2005 (BP-Z3, 4AT) — Other years inferred within NB2 non-turbo family from actual 2003/2005 factory evidence.
750–850 rpm (800 ± 50 rpm)750–850 rpm (800 ± 50 rpm)
Idle-up speed — automatic in Drive (NB2 non-turbo)
NB 2001–2005 (BP-Z3, 4AT) — Other years inferred within NB2 non-turbo family from actual 2003/2005 factory evidence.
700–800 rpm (750 ± 50 rpm)700–800 rpm (750 ± 50 rpm)
Engine idle speed — adjustment condition (NA8 MT)
NA 1994–1997 (BP, 5MT) — Other years inferred from 1994 factory evidence.
800–900 (850 ± 50) rpm, Neutral800–900 (850 ± 50) rpm, Neutral
Engine idle speed — adjustment condition (NA8 AT)
NA 1994–1997 (BP, 4AT) — Other years inferred from 1994 factory evidence.
750–850 (800 ± 50) rpm, P range750–850 (800 ± 50) rpm, P range
Factory service specifications (1999)
Fuel pump maximum pressure test (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
Less than 92 psi (640 kPa; 6.5 kgf/cm²).Less than 640 kPa (6.5 kgf/cm², 92 psi).
Fuel pump isolated hold pressure (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
More than 50 psi (340 kPa; 3.5 kgf/cm²), five minutes after pump shutdown.More than 340 kPa (3.5 kgf/cm², 50 psi), five minutes after pump shutdown.
Fuel line pressure with pump operating (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
53–61 psi (370–420 kPa; 3.7–4.3 kgf/cm²).370–420 kPa (3.7–4.3 kgf/cm², 53–61 psi).
Fuel system residual pressure (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
More than 36.3 psi (250 kPa; 2.55 kgf/cm²), five minutes after pump shutdown.More than 250 kPa (2.55 kgf/cm², 36.3 psi), five minutes after pump shutdown.
Fuel injector resistance (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
12–16 Ω at 68 °F (20 °C).12–16 Ω at 20°C (68°F).
Fuel injector nozzle leakage test (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
Less than 1 drop in 2 minutes.Less than 1 drop in 2 minutes.
Fuel line pressure at idle (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
53–61 psi (370–420 kPa; 3.7–4.3 kgf/cm²).370–420 kPa (3.7–4.3 kgf/cm², 53–61 psi).
EVAP whole-system vacuum hold (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
Apply 1.7 kPa (13 mmHg, 0.5 inHg) vacuum; the specified reading must remain for at least two minutes.Apply 1.7 kPa (13 mmHg, 0.5 inHg) vacuum; the specified reading must remain for at least two minutes.
EVAP canister-to-tank vacuum hold (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
Apply 1.7 kPa (13 mmHg, 0.5 inHg) vacuum; the specified reading must remain for at least two minutes.Apply 1.7 kPa (13 mmHg, 0.5 inHg) vacuum; the specified reading must remain for at least two minutes.
EVAP canister-to-purge section vacuum hold (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
Apply 3.3 kPa (25 mmHg, 1.0 inHg) vacuum; the specified reading must remain for at least two minutes.Apply 3.3 kPa (25 mmHg, 1.0 inHg) vacuum; the specified reading must remain for at least two minutes.
Fuel-cut injector-duration test (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
During the specified deceleration: 0 msec injector duration; 2–5 msec when engine speed drops below 1,000 rpm.During the specified deceleration: 0 msec injector duration; 2–5 msec when engine speed drops below 1,000 rpm.
Idle air control valve resistance (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
8.7—10.5 Ω at 75 °F (24 °C).8.7—10.5 Ω at 24°C {75°F}.
VICS one-way check valve airflow (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
Air flows A→B; air does not flow B→A.Air flows A→B; air does not flow B→A.
VICS shutter actuator vacuum test (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
Above −1.3 kPa {−10 mmHg, −0.4 inHg}: not pulled; −1.3—−4.0 kPa {−10—−30 mmHg, −0.4—−1.1 inHg}: starts moving; below −26 kPa {−190 mmHg, −7.5 inHg}: fully pulled.Above −1.3 kPa {−10 mmHg, −0.4 inHg}: not pulled; −1.3—−4.0 kPa {−10—−30 mmHg, −0.4—−1.1 inHg}: starts moving; below −26 kPa {−190 mmHg, −7.5 inHg}: fully pulled.
VICS solenoid valve airflow test (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
Unpowered: A–B terminal continuity and airflow between ports B–C. Battery positive on terminal A and ground on B: airflow between ports A–B.Unpowered: A–B terminal continuity and airflow between ports B–C. Battery positive on terminal A and ground on B: airflow between ports A–B.
Accelerator cable free play (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
0.04—0.11 in (1—3 mm).1—3 mm {0.04—0.11 in}.
Fuel pump connector continuity test (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
Continuity between pump terminals B and D.Continuity between pump terminals B and D.
Fuel pump relay continuity test (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
Unpowered: continuity A–B. Battery positive on A and ground on B: continuity C–E.Unpowered: continuity A–B. Battery positive on A and ground on B: continuity C–E.
Fuel injector injection volume (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
66—82 ml {66—82 cc, 2.3—2.7 fl oz}/15 sec.66—82 ml {66—82 cc, 2.3—2.7 fl oz}/15 sec.
Tank pressure control valve airflow test (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
Unpowered, pressure applied to port A: 0—+0.20 kPa {0—+1.47 mmHg, 0—+0.06 inHg}: no airflow; above +0.98 kPa {+7.36 mmHg, +0.29 inHg}: airflow; below −0.98 kPa {−7.36 mmHg, −0.29 inHg}: airflow. Powered terminal A positive/B ground: smooth airflow.Unpowered, pressure applied to port A: 0—+0.20 kPa {0—+1.47 mmHg, 0—+0.06 inHg}: no airflow; above +0.98 kPa {+7.36 mmHg, +0.29 inHg}: airflow; below −0.98 kPa {−7.36 mmHg, −0.29 inHg}: airflow. Powered terminal A positive/B ground: smooth airflow.
Canister drain-cut valve airflow test (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
Unpowered: terminal A–B continuity and airflow between ports A and B. Terminal A battery positive/B ground: no airflow between ports A and B.Unpowered: terminal A–B continuity and airflow between ports A and B. Terminal A battery positive/B ground: no airflow between ports A and B.
Purge solenoid airflow test (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
Unpowered: terminal A–B continuity, no airflow between ports A and B. Terminal A battery positive/B ground: airflow between ports A and B.Unpowered: terminal A–B continuity, no airflow between ports A and B. Terminal A battery positive/B ground: airflow between ports A and B.
Evaporative chamber airflow test (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
Air blown into port A must flow from port B.Air blown into port A must flow from port B.
EGR valve coil resistance (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
Approximately 22 Ω for each pair C–E, C–A, D–B and D–F.Approximately 22 Ω for each pair C–E, C–A, D–B and D–F.
EGR boost sensor solenoid airflow test (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
Unpowered: electrical A–B continuity; airflow between pneumatic B and C. Electrical A battery positive/B ground: airflow between pneumatic A and B.Unpowered: electrical A–B continuity; airflow between pneumatic B and C. Electrical A battery positive/B ground: airflow between pneumatic A and B.
PCV valve directional airflow check (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
Air applied from port A: airflow. Air applied from port B: no airflow.Air applied from port A: airflow. Air applied from port B: no airflow.
Intake manifold vacuum at idle (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
At idle: more than 60 kPa {450 mmHg, 18 inHg} manifold vacuum.At idle: more than 60 kPa {450 mmHg, 18 inHg} manifold vacuum.
Fuel-filler vent cut valve airflow inspection (1999–2000)
NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
Cap installed: air passes from rollover-valve connection to TPCV connection. Cap removed and internal filler-port lever depressed: air must not pass along that same path.Cap installed: air passes from rollover-valve connection to TPCV connection. Cap removed and internal filler-port lever depressed: air must not pass along that same path.
Factory service specifications (2003)
VTCS solenoid valve resistance screening (2001–2004)
NB 2001–2004 (BP-Z3) — 2002 applicability is supported by matching text in publication 1719-1U-01G; 2001 follows the owner-approved early-NB2 carry-over policy and is not an independently verified year.
DTC P2009/P2010 component screening: resistance must be more than 28 ohms.DTC P2009/P2010 component screening: resistance must be more than 28 ohms.
Intake manifold vacuum at idle (2001–2003)
NB 2001–2003 (BP-Z3) — 2002 applicability is supported by matching text in publication 1719-1U-01G; 2001 follows the owner-approved early-NB2 carry-over policy and is not an independently verified year.
More than 60 kPa {450 mmHg, 18 inHg} vacuum at idle.More than 60 kPa {450 mmHg, 18 inHg} vacuum at idle.
VTCS check/delay valve directional airflow (2003)
NB 2003 (BP-Z3)
Removed original valve: airflow from the rounded-body port A to the tapered-body port B; reverse flow blocked.Removed original valve: airflow from the rounded-body port A to the tapered-body port B; reverse flow blocked.
Intake manifold gasket orientation (2003)
NB 2003 (BP-Z3)
Factory intake manifold gasket: convex side faces the intake manifold.Factory intake manifold gasket: convex side faces the intake manifold.
Dynamic chamber gasket orientation (2003)
NB 2003 (BP-Z3)
Factory dynamic chamber gasket: convex side faces the intake manifold.Factory dynamic chamber gasket: convex side faces the intake manifold.
Dynamic chamber bracket tightening order (2003)
NB 2003 (BP-Z3)
After fitting the bracket bolts firmly, tighten the dynamic-chamber-side bolt before the fuel-distributor-side bolt.After fitting the bracket bolts firmly, tighten the dynamic-chamber-side bolt before the fuel-distributor-side bolt.
Fuel pump isolated continuity (2003)
NB 2003 (BP-Z3)
Continuity between pump terminals B and D.Continuity between pump terminals B and D.
Fuel drawing pump hose preparation (2003)
NB 2003 (BP-Z3)
Hose outer diameter 0.51 in (13 mm); length 85.0 in (2160 mm) or longer; illustrated inlet end cut at 30°.Hose outer diameter 13 mm {0.51 in}; length 2160 mm {85.0 in} or longer; illustrated inlet end cut at 30°.
Factory fuel and emission service specifications (2004)
Purge solenoid valve component resistance (2004)
NB 2004 (BP-Z3)
Between the disconnected valve’s component terminals: 22–26 ohms.Between the disconnected valve’s component terminals: 22–26 ohms.
EVAP canister-to-tank isolated vacuum retention (2004)
NB 2004 (BP-Z3)
Apply 1.7 kPa {13 mmHg, 0.5 inHg} vacuum to the disconnected hose; hold for at least 2 min.Apply 1.7 kPa {13 mmHg, 0.5 inHg} vacuum to the disconnected hose; hold for at least 2 min.
EVAP canister-to-purge isolated vacuum retention (2004)
NB 2004 (BP-Z3)
Apply 3.3 kPa {25 mmHg, 1.0 inHg} vacuum to the disconnected hose; hold for at least 2 min.Apply 3.3 kPa {25 mmHg, 1.0 inHg} vacuum to the disconnected hose; hold for at least 2 min.
Intake manifold vacuum at idle (2004)
NB 2004 (BP-Z3)
More than 60 kPa {450 mmHg, 18 inHg} vacuum at idle.More than 60 kPa {450 mmHg, 18 inHg} vacuum at idle.
Dynamic chamber bracket tightening order (2004–2005)
NB 2004–2005 (BP-Z3)
After fitting the bracket bolts firmly, tighten the dynamic-chamber-side bolt before the fuel-distributor-side bolt.After fitting the bracket bolts firmly, tighten the dynamic-chamber-side bolt before the fuel-distributor-side bolt.
Fuel pump isolated continuity (2004)
NB 2004 (BP-Z3)
Continuity between pump terminals B and D.Continuity between pump terminals B and D.
Fuel drawing pump hose preparation (2004)
NB 2004 (BP-Z3)
Hose outer diameter 0.51 in (13 mm); length 85.0 in (2160 mm) or longer; illustrated inlet end cut at 30°.Hose outer diameter 13 mm {0.51 in}; length 2160 mm {85.0 in} or longer; illustrated inlet end cut at 30°.
PCV valve directional airflow check (2004)
NB 2004 (BP-Z3)
Removed factory PCV valve: air applied at the wide cylindrical body end must flow through; air applied at the narrow hose nipple beyond the flange must not flow through.Removed factory PCV valve: air applied at the wide cylindrical body end must flow through; air applied at the narrow hose nipple beyond the flange must not flow through.
Purge solenoid vacuum and evaporative hose seating (2001–2004)
NB 2001–2004 (BP-Z3) — 2002 applicability is supported by matching text in publication 1719-1U-01G; 2001 follows the owner-approved early-NB2 carry-over policy and is not an independently verified year.
Seat both the vacuum hose and evaporative hose against their stoppers.Seat both the vacuum hose and evaporative hose against their stoppers.
Evaporative chamber airflow check (2004–2005)
NB 2004–2005 (BP-Z3)
Removed evaporative chamber: blow through its large hose neck and verify airflow from the pair of central openings in the perforated end face.Removed evaporative chamber: blow through its large hose neck and verify airflow from the pair of central openings in the perforated end face.
Factory source validation additions (2005)
Fuel line pressure at idle and acceleration (2004–2005)
NB 2005 (BP-Z3/BP-Z3-TURBO); NB 2004 (BP-Z3-TURBO) — 2005 Mazdaspeed applicability is supported by the cited 2005 factory pages; 2004 Mazdaspeed follows the owner-approved 2004–2005 Mazdaspeed carry-over policy. No 2004 Mazdaspeed revision verification is claimed.
53–61 psi (370–420 kPa; 3.7–4.3 kgf/cm²)370–420 kPa (3.7–4.3 kgf/cm², 53–61 psi)
Purge solenoid valve component resistance (2004–2005)
NB 2005 (BP-Z3/BP-Z3-TURBO); NB 2004 (BP-Z3-TURBO) — 2005 Mazdaspeed applicability is supported by the cited 2005 factory pages; 2004 Mazdaspeed follows the owner-approved 2004–2005 Mazdaspeed carry-over policy. No 2004 Mazdaspeed revision verification is claimed.
Between the disconnected valve’s component terminals: 22–26 ohms.Between the disconnected valve’s component terminals: 22–26 ohms.
EGR boost sensor solenoid valve resistance (2004–2005)
NB 2005 (BP-Z3/BP-Z3-TURBO); NB 2004 (BP-Z3-TURBO) — 2005 Mazdaspeed applicability is supported by the cited 2005 factory pages; 2004 Mazdaspeed follows the owner-approved 2004–2005 Mazdaspeed carry-over policy. No 2004 Mazdaspeed revision verification is claimed.
Between the disconnected valve’s component-side terminals: 23–27 ohms.Between the disconnected valve’s component-side terminals: 23–27 ohms.
EVAP canister-to-tank isolated vacuum retention (2004–2005)
NB 2005 (BP-Z3/BP-Z3-TURBO); NB 2004 (BP-Z3-TURBO) — 2005 Mazdaspeed applicability is supported by the cited 2005 factory pages; 2004 Mazdaspeed follows the owner-approved 2004–2005 Mazdaspeed carry-over policy. No 2004 Mazdaspeed revision verification is claimed.
Apply 1.7 kPa {13 mmHg, 0.5 inHg} vacuum to the disconnected hose; hold for at least 2 min.Apply 1.7 kPa {13 mmHg, 0.5 inHg} vacuum to the disconnected hose; hold for at least 2 min.
EVAP canister-to-purge isolated vacuum retention (2004–2005)
NB 2005 (BP-Z3/BP-Z3-TURBO); NB 2004 (BP-Z3-TURBO) — 2005 Mazdaspeed applicability is supported by the cited 2005 factory pages; 2004 Mazdaspeed follows the owner-approved 2004–2005 Mazdaspeed carry-over policy. No 2004 Mazdaspeed revision verification is claimed.
Apply 3.3 kPa {25 mmHg, 1.0 inHg} vacuum to the disconnected hose; hold for at least 2 min.Apply 3.3 kPa {25 mmHg, 1.0 inHg} vacuum to the disconnected hose; hold for at least 2 min.
Intake manifold vacuum at idle (2004–2005)
NB 2005 (BP-Z3/BP-Z3-TURBO); NB 2004 (BP-Z3-TURBO) — 2005 Mazdaspeed applicability is supported by the cited 2005 factory pages; 2004 Mazdaspeed follows the owner-approved 2004–2005 Mazdaspeed carry-over policy. No 2004 Mazdaspeed revision verification is claimed.
More than 60 kPa {450 mmHg, 18 inHg} vacuum at idle.More than 60 kPa {450 mmHg, 18 inHg} vacuum at idle.
Factory service specifications
Intake manifold vacuum at idle (1990–1991)
NA 1990–1991 (B6) — 1990 applicability is supported by the cited 1990 factory pages; 1991 follows the owner-approved 1990-to-short-crank-1991 carry-over policy. No 1991 revision verification or long-crank applicability is claimed.
More than 450 mmHg (17.7 inHg) at idleMore than 450 mmHg (17.7 inHg) at idle
Dashpot lever contact speed (1990–1991)
NA 1990–1991 (B6) — 1990 applicability is supported by the cited 1990 factory pages; 1991 follows the owner-approved 1990-to-short-crank-1991 carry-over policy. No 1991 revision verification or long-crank applicability is claimed.
2,500 ± 150 rpm as engine speed slowly decreases2,500 ± 150 rpm as engine speed slowly decreases
Deceleration fuel cut inspection speed (1990–1991)
NA 1990–1991 (B6) — 1990 applicability is supported by the cited 1990 factory pages; 1991 follows the owner-approved 1990-to-short-crank-1991 carry-over policy. No 1991 revision verification or long-crank applicability is claimed.
Above 1,900 rpm after warm-up, during decelerationAbove 1,900 rpm after warm-up, during deceleration
Fuel tank hose insertion depth (1990–1991)
NA 1990–1991 (B6) — 1990 applicability is supported by the cited 1990 factory pages; 1991 follows the owner-approved 1990-to-short-crank-1991 carry-over policy. No 1991 revision verification or long-crank applicability is claimed.
Main fuel, return and evaporation hoses at tank fittings at least 1.0 in (25 mm); filler hose at both pipes at least 1.4 in (35 mm).Main fuel, return and evaporation hoses at tank fittings at least 25 mm (1.0 in); filler hose at both pipes at least 35 mm (1.4 in).
Circuit-opening relay switching test (1990–1991)
NA 1990–1991 (B6) — 1990 applicability is supported by the cited 1990 factory pages; 1991 follows the owner-approved 1990-to-short-crank-1991 carry-over policy. No 1991 revision verification or long-crank applicability is claimed.
Apply 12 V to STA and ground E1 — B–Fp continuity; apply 12 V to B and ground Fc — Fp at battery voltage.Apply 12 V to STA and ground E1 — B–Fp continuity; apply 12 V to B and ground Fc — Fp at battery voltage.
Circuit-opening relay circuit voltage (1990–1991)
NA 1990–1991 (B6) — 1990 applicability is supported by the cited 1990 factory pages; 1991 follows the owner-approved 1990-to-short-crank-1991 carry-over policy. No 1991 revision verification or long-crank applicability is claimed.
Terminal order Fp, Fc, B, STA, E1: ignition ON — 0, 12, 12, 0, 0 V; START — 12, 0, 12, 12, 0 V; idle — 12, 0, 12, 0, 0 V.Terminal order Fp, Fc, B, STA, E1: ignition ON — 0, 12, 12, 0, 0 V; START — 12, 0, 12, 12, 0 V; idle — 12, 0, 12, 0, 0 V.
Fuel injector leakage test (1990–1991)
NA 1990–1991 (B6) — 1990 applicability is supported by the cited 1990 factory pages; 1991 follows the owner-approved 1990-to-short-crank-1991 carry-over policy. No 1991 revision verification or long-crank applicability is claimed.
No nozzle leakage; a drop after 1 minute is acceptable.No nozzle leakage; a drop after 1 minute is acceptable.
Two-way check valve vacuum test (1990–1991)
NA 1990–1991 (B6) — 1990 applicability is supported by the cited 1990 factory pages; 1991 follows the owner-approved 1990-to-short-crank-1991 carry-over policy. No 1991 revision verification or long-crank applicability is claimed.
Airflow at approximately 37 mmHg (1.46 inHg) vacuum at port A and approximately 44 mmHg (1.73 inHg) at port B.Airflow at approximately 37 mmHg (1.46 inHg) vacuum at port A and approximately 44 mmHg (1.73 inHg) at port B.
PCV valve directional airflow check (1990–1991)
NA 1990–1991 (B6) — 1990 applicability is supported by the cited 1990 factory pages; 1991 follows the owner-approved 1990-to-short-crank-1991 carry-over policy. No 1991 revision verification or long-crank applicability is claimed.
Removed valve: air passes from port A to B; no air passes from port B to A.Removed valve: air passes from port A to B; no air passes from port B to A.
Purge solenoid airflow test (1990–1991)
NA 1990–1991 (B6) — 1990 applicability is supported by the cited 1990 factory pages; 1991 follows the owner-approved 1990-to-short-crank-1991 carry-over policy. No 1991 revision verification or long-crank applicability is claimed.
No airflow when unpowered; airflow with 12 V and ground applied to the disconnected solenoid terminals.No airflow when unpowered; airflow with 12 V and ground applied to the disconnected solenoid terminals.
Intake manifold vacuum at idle (1992–1993)
NA 1992–1993 (B6) — 1992 applicability is supported by the cited 1992 factory pages; 1993 follows the owner-approved 1992–1993 NA6 carry-over policy. No 1993 revision verification is claimed.
More than 450 mmHg (17.7 inHg) at idleMore than 450 mmHg (17.7 inHg) at idle
Dashpot lever contact speed (1992–1993)
NA 1992–1993 (B6) — 1992 applicability is supported by the cited 1992 factory pages; 1993 follows the owner-approved 1992–1993 NA6 carry-over policy. No 1993 revision verification is claimed.
2,500 ± 150 rpm as engine speed slowly decreases2,500 ± 150 rpm as engine speed slowly decreases
Engine idle speed — automatic transmission adjustment condition (1992–1993)
NA 1992–1993 (B6, 4AT) — 1992 applicability is supported by the cited 1992 factory pages; 1993 follows the owner-approved 1992–1993 NA6 carry-over policy. No 1993 revision verification is claimed.
850 ± 50 rpm (P range)850 ± 50 rpm (P range)
Deceleration fuel cut inspection speed (1992–1993)
NA 1992–1993 (B6) — 1992 applicability is supported by the cited 1992 factory pages; 1993 follows the owner-approved 1992–1993 NA6 carry-over policy. No 1993 revision verification is claimed.
Above 1,900 rpm after warm-up, during decelerationAbove 1,900 rpm after warm-up, during deceleration
Fuel tank hose insertion depth (1992–1993)
NA 1992–1993 (B6) — 1992 applicability is supported by the cited 1992 factory pages; 1993 follows the owner-approved 1992–1993 NA6 carry-over policy. No 1993 revision verification is claimed.
Main fuel, return and evaporation hoses at tank fittings at least 1.0 in (25 mm); filler hose at both pipes at least 1.4 in (35 mm).Main fuel, return and evaporation hoses at tank fittings at least 25 mm (1.0 in); filler hose at both pipes at least 35 mm (1.4 in).
Three-way check valve vacuum test (1992–1993 AT)
NA 1992–1993 (B6, 4AT) — 1992 applicability is supported by the cited 1992 factory pages; 1993 follows the owner-approved 1992–1993 NA6 carry-over policy. No 1993 revision verification is claimed.
Airflow at approximately 37 mmHg (1.46 inHg) vacuum at port A and approximately 70 mmHg (2.76 inHg) at port B, with port C plugged.Airflow at approximately 37 mmHg (1.46 inHg) vacuum at port A and approximately 70 mmHg (2.76 inHg) at port B, with port C plugged.