Showing specs for all NA & NB Miatas

PCV valve directional airflow check (2001–2003)

Removed factory PCV valve: air applied at the wide cylindrical body end must flow through; air applied at the narrow hose nipple beyond the flange must not flow through.Removed factory PCV valve: air applied at the wide cylindrical body end must flow through; air applied at the narrow hose nipple beyond the flange must not flow through.

Factory manualTaken from a Mazda factory workshop manual, with page citation.
Procedure

Remove the PCV valve before checking. The factory figure identifies the wide cylindrical body end as port A and the narrow hose nipple extending from the opposite side of the flange as port B. Check both directions; replace the valve if either result differs. The manual specifies a directional airflow check without a numerical pressure or flow-rate limit.

Applies to
  • NB 2003 (BP-Z3)
  • NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware, test setup and connector perspective compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
  • Verified in: 2003 Mazda MX-5 Miata Workshop Manual (electronic manual capture); Mazda MX-5 Workshop Manual, publication 1719-1U-01G (2002 base edition)

Sources (2)

View 2 source citations
  • Mazda MX-5 Workshop Manual, publication 1719-1U-01G (2002 base edition)Tier 1
    Page 01–16–10 (PDF p. 344) · Printed value & notes
    Part no. 1719-1U-01G
    Page 01–16–10 (PDF p. 344)
    Printed: “Remove the PCV valve. Blow through the valve and verify that air flows as specified. Condition Air applied from port A Air applied from port B Airflow Yes No”
    Visually checked against the original factory page; printed units and component/test context retained. Source edition/market limitations remain as documented; no additional verified years assigned.
  • 2003 Mazda MX-5 Miata Workshop Manual (electronic manual capture)Tier 1
    Page PCV Valve Inspection (PDF p. 745) · Printed value & notes
    Page PCV Valve Inspection (PDF p. 745)
    Printed: “Air applied from port A Yes Air applied from port B No”