Purge solenoid airflow test — early NB2
Removed purge valve: no airflow between its hose ports when unpowered; with electrical A positive / B grounded, airflow passes.Removed purge valve: no airflow between its hose ports when unpowered; with electrical A positive / B grounded, airflow passes.
Disconnect the negative battery cable before removing the original purge solenoid. Perform the isolated component test only when directed. The factory table requires continuity across the two electrical contacts without power, with no airflow between the two hose ports. Looking into the valve’s component connector terminal face with its locking tab uppermost, B is left and A is right. Apply battery positive to A and ground B, then verify airflow between the two ports. Replace the valve if incorrect; if it passes, investigate hose routing, kinks, leakage and the circuit as directed. This airflow test supplies no numerical resistance or pressure limit.
- NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware, test setup and connector perspective compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
- Verified in: Mazda MX-5 Workshop Manual, publication 1719-1U-01G (2002 base edition)
Sources (1)
View 1 source citations
- Mazda MX-5 Workshop Manual, publication 1719-1U-01G (2002 base edition)Tier 1
Page 01–16–8 (PDF p. 342) · Printed value & notes
Part no. 1719-1U-01GPage 01–16–8 (PDF p. 342)Printed: “Perform the following test only when directed. Remove the purge solenoid valve. Inspect airflow between the ports under the following conditions. Terminal A B Port A B B+ GND”Visually checked against the original factory page; printed units and component/test context retained. Source edition/market limitations remain as documented; no additional verified years assigned.