Dynamic chamber bracket tightening order (2003)
After fitting the bracket bolts firmly, tighten the dynamic-chamber-side bolt before the fuel-distributor-side bolt.After fitting the bracket bolts firmly, tighten the dynamic-chamber-side bolt before the fuel-distributor-side bolt.
Disconnect the negative battery cable and service the intake only with the engine and intake cool. Drain and refill coolant as directed by the complete factory intake-air removal/installation procedure. This is the small bracket joining the dynamic chamber and fuel distributor, item 9 in the exploded view. It is separate from the large manifold support stay. Use fastener-specific factory torques; this record supplies the order only.
- NB 2003 (BP-Z3)
- Verified in: 2003 Mazda MX-5 Miata Workshop Manual (electronic manual capture)
Sources (1)
View 1 source citations
- 2003 Mazda MX-5 Miata Workshop Manual (electronic manual capture)Tier 1
Page Intake Air System Removal/Installation (PDF pp.675–677) · Printed value & notes
Page Intake Air System Removal/Installation (PDF pp.675–677)Printed: “Tighten the bolts firmly, then tighten the dynamic chamber side bolt before tightening the fuel distributor side bolt.”
Related service specs
- VTCS solenoid valve resistance screening (2001–2004)
- Intake manifold vacuum at idle (2001–2003)
- VTCS check/delay valve directional airflow (2003)
- Intake manifold gasket orientation (2003)
- Dynamic chamber gasket orientation (2003)
- Fuel pump isolated continuity (2003)
- Fuel drawing pump hose preparation (2003)