Fuel pump relay continuity test (1999–2000)
Unpowered: continuity A–B. Battery positive on A and ground on B: continuity C–E.Unpowered: continuity A–B. Battery positive on A and ground on B: continuity C–E.
Perform only when directed following the fuel-pump operation/control simulation checks. Inspect the relay before removing it from its bracket: the lock can break easily, so remove it only when replacement is required. Disconnect battery negative and unplug the relay connector above the accelerator pedal (six-pin shell with four populated terminals). With an ohmmeter check A–B coil continuity unpowered. For the second table row apply battery positive to A and ground to B, and check switched continuity C–E. Use the factory relay terminal labels: its drawn relay view has E,C,A across the top and B at lower right, while the harness terminal-side view is mirrored. Replace the relay if incorrect; otherwise follow the specified pump/wiring diagnosis. Reconnect the relay connector and battery negative afterward. No numerical coil resistance is specified.
- NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
- Verified in: 1999 Mazda MX-5 Miata Workshop Manual
Sources (1)
View 1 source citations
Page 01–14–19 (PDF p. 252) · Printed value & notes
Page 01–14–19 (PDF p. 252)Printed: “Perform the following test only when directed. Disconnect the negative battery cable. Disconnect the fuel pump relay connector (6-pin type connector; 4 terminal) located above the accelerator pedal. Inspect for continuity between the fuel pump relay terminals by using an ohmmeter.”
Related service specs
- Fuel pump maximum pressure test (1999–2000)
- Fuel pump isolated hold pressure (1999–2000)
- Fuel line pressure with pump operating (1999–2000)
- Fuel system residual pressure (1999–2000)
- Fuel injector resistance (1999–2000)
- Fuel injector nozzle leakage test (1999–2000)
- Fuel line pressure at idle (1999–2000)
- EVAP whole-system vacuum hold (1999–2000)