VICS shutter actuator vacuum test (1999–2000)
Above −1.3 kPa {−10 mmHg, −0.4 inHg}: not pulled; −1.3—−4.0 kPa {−10—−30 mmHg, −0.4—−1.1 inHg}: starts moving; below −26 kPa {−190 mmHg, −7.5 inHg}: fully pulled.Above −1.3 kPa {−10 mmHg, −0.4 inHg}: not pulled; −1.3—−4.0 kPa {−10—−30 mmHg, −0.4—−1.1 inHg}: starts moving; below −26 kPa {−190 mmHg, −7.5 inHg}: fully pulled.
Perform the isolated actuator operation test only when directed after the factory VICS operation inspection. Disconnect the vacuum hose from the VICS shutter valve actuator, connect a vacuum pump directly to it and apply vacuum slowly while watching the actuator rod. Use the signed pressure ranges exactly as printed; the source gives no additional transition or travel specification between the start-to-move and fully-pulled rows. Replace the actuator if incorrect. If this test passes but simulation failed, inspect hose routing, kinks and leakage. This is a vacuum diaphragm rod test, separate from solenoid-port airflow and engine-speed switching.
- NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
- Verified in: 1999 Mazda MX-5 Miata Workshop Manual
Sources (1)
View 1 source citations
Page 01–13–5 (PDF p. 231) · Printed value & notes
Page 01–13–5 (PDF p. 231)Printed: “Perform the following test only when directed. Vacuum kPa {mmHg, inHg} Rod movement Above −1.3 {−10, −0.4} Not pulled −1.3—−4.0 {−10—−30, −0.4—−1.1} Start to move Below −26 {−190, −7.5} Fully pulled”
Related service specs
- Fuel pump maximum pressure test (1999–2000)
- Fuel pump isolated hold pressure (1999–2000)
- Fuel line pressure with pump operating (1999–2000)
- Fuel system residual pressure (1999–2000)
- Fuel injector resistance (1999–2000)
- Fuel injector nozzle leakage test (1999–2000)
- Fuel line pressure at idle (1999–2000)
- EVAP whole-system vacuum hold (1999–2000)