Showing specs for all NA & NB Miatas

Headlight and cooling-fan relay bench continuity (1990–1991)

Contacts 3–4: no continuity unpowered; continuity with 12V applied to terminal 1 and terminal 2 grounded.Contacts 3–4: no continuity unpowered; continuity with 12V applied to terminal 1 and terminal 2 grounded.

Factory manualTaken from a Mazda factory workshop manual, with page citation.
Procedure

For the original four-terminal normally open headlight relay and cooling-fan relay only. Disconnect the relay for the component bench test. View the component terminal face in the factory flat view with its raised center key at the top: upper row 3, 1; lower row 4, 2, from left to right. First check 3–4 with the relay unpowered. If incorrect, replace the relay; otherwise apply 12V to coil terminal 1 and ground coil terminal 2, then check the separate switched contacts 3–4 for continuity. Replace the relay if this check fails. The ohmmeter connects to the switched contacts, not across the powered coil. This terminal arrangement does not apply to the separately illustrated horn/TNS or five-terminal retractor relay, and no coil-resistance acceptance or interchangeability is specified.

Applies to
  • NA 1990–1991 (B6) — 1990 applicability is supported by the cited 1990 factory pages; 1991 follows the owner-approved 1990-to-short-crank-1991 carry-over policy. No 1991 revision verification or long-crank applicability is claimed.
  • Verified in: 1990 Mazda MX-5 Miata Workshop Manual

Sources (2)

View 2 source citations
  • Page T–19 (PDF p.601) · Printed value & notes
    Part no. 1193-10-89C
    Page T–19 (PDF p.601)
    Printed: “Headlight relay and cooling fan relay Check continuity between terminals 3 and 4. 3—4 No Apply 12V to terminal 1 and ground terminal 2. Check for continuity between terminals 3 and 4. 3—4 Yes”
  • Page T–57 (PDF p.639) · Printed value & notes
    Part no. 1193-10-89C
    Page T–57 (PDF p.639)
    Printed: “Headlight relay (U.S. spec.) Check continuity between terminals 3 and 4. 3—4 No Apply 12V to terminal 1 and ground terminal 2. Check for continuity between terminals 3 and 4. 3—4 Yes”
    Headlight-relay inspection repeats the switching test; T–19 independently supplies the complete flat terminal face and cooling-fan application.