Heater blower-switch connected voltage checks (1992–1993)
Ignition ON: fourth blower speed → black (B) switch ground wire 0 V; blower and A/C OFF → battery voltage on blue/white, blue/red, blue/green and blue/yellow at the connected blower switch.Ignition ON: fourth blower speed → black (B) switch ground wire 0 V; blower and A/C OFF → battery voltage on blue/white, blue/red, blue/green and blue/yellow at the connected blower switch.
Measure relative to body ground, with the original switch, motor and resistor connectors connected. Check the black ground at fourth speed first: battery voltage there indicates a ground-path fault. Then turn both blower and A/C OFF and measure the four named colored wires individually. A zero feed at this stage directs repair between resistor and switch; with all four at battery voltage the flow directs switch replacement. These powered checks are separate from the isolated switch-continuity test.
- NA 1992–1993 (B6) — 1992 applicability is supported by the cited 1992 factory pages; 1993 follows the owner-approved 1992–1993 NA6 carry-over policy. No 1993 revision verification is claimed.
- Verified in: 1992 Mazda MX-5 Miata Workshop Manual
Sources (1)
View 1 source citations
- 1992 Mazda MX-5 Miata Workshop ManualTier 1
Page U–8 (PDF p. 1000) · Printed value & notes
Part no. 1271-10-91G (9999-95-0428-92)Page U–8 (PDF p. 1000)Printed: “Turn the ignition switch ON. Turn the blower switch to the fourth position. Measure the voltage at terminal-wire (B) of the blower switch connector. (B) 0V Turn the ignition switch ON. Turn the blower switch and A/C switch OFF. Measure the voltage at the terminal-wires of the blower switch connector. VB: Battery voltage (L/W) VB (L/R) VB (L/G) VB (L/Y) VB”
Related service specs
- Heater blower-speed switch continuity (1990–1993)
- Heater blower-motor supply voltage (1992–1993)
- Heater blower-resistor connected voltage checks (1992–1993)
- A/C magnetic-clutch feed voltage (1992–1993)
- A/C condenser-fan connected voltage checks (1992–1993)
- A/C insufficient-cooling pressure check at 2,000 rpm (1990–1993)
- A/C sight-glass charge observation (1992–1993)
- Heater blower-motor direct battery check (1990–1993)