Showing specs for all NA & NB Miatas

Windshield sealant-dam setback — non-turbo (2001–2004)

0.28 in (7.0 mm) inboard from the glass edge.7.0 mm {0.28 in} inboard from the glass edge.

Factory manualTaken from a Mazda factory workshop manual, with page citation.
Procedure

Securely bond the dam around the windshield glass perimeter, setting its outward face 7.0 mm {0.28 in} inward from the glass edge. This positions the dam for the separate sealant bead, before the glass is installed. The small lower-edge dam cut near a spacer is a separate detail under research; the setback value does not define that cut.

Applies to
  • NB 2003–2004 (BP-Z3)
  • NB 2001–2002 (BP-Z3) — 2001–2002 applicability follows the owner-approved early-NB2 carry-over policy, with hardware and test setup compared against publication 1719-1U-01G. Its existing owner-accepted 2002 source coverage is unchanged; 2001 is carry-over, not an independently verified year.
  • Verified in: 2003 Mazda MX-5 Miata Workshop Manual (electronic manual capture); 2004 Mazda MX-5 Miata Workshop Manual (electronic manual capture); Mazda MX-5 Workshop Manual, publication 1719-1U-01G (2002 base edition)

Sources (3)

View 3 source citations
  • Mazda MX-5 Workshop Manual, publication 1719-1U-01G (2002 base edition)Tier 1
    Page 09–12–15 (PDF p. 862) · Printed value & notes
    Part no. 1719-1U-01G
    Page 09–12–15 (PDF p. 862)
    Printed: “Securely bond a dam along the circumference of the glass 7.0 mm {0.28 in} from the edge.”
    Visually checked against the original factory page; printed units and component/test context retained. Source edition/market limitations remain as documented; no additional verified years assigned.
  • 2003 Mazda MX-5 Miata Workshop Manual (electronic manual capture)Tier 1
    Page Windshield Installation (PDF p. 1873) · Printed value & notes
    Page Windshield Installation (PDF p. 1873)
    Printed: “Securely bond a dam along the circumference of the glass 7.0 mm {0.28 in} from the edge.”
  • 2004 Mazda MX-5 Miata Workshop Manual (electronic manual capture)Tier 1
    Page Windshield Installation (PDF p. 1869) · Printed value & notes
    Page Windshield Installation (PDF p. 1869)
    Printed: “Securely bond a dam along the circumference of the glass 7.0 mm {0.28 in} from the edge.”