Showing specs for all NA & NB Miatas

A/C evacuation and vacuum retention (2004–2005)

Run the vacuum pump for 15 minutes; both manifold gauges at –101 kPa {–760 mmHg, –29.9 inHg}. Close all manifold valves, stop the pump and wait about 5 minutes; the low-side reading must remain unchanged.Run the vacuum pump for 15 minutes; both manifold gauges at –101 kPa {–760 mmHg, –29.9 inHg}. Close all manifold valves, stop the pump and wait about 5 minutes; the low-side reading must remain unchanged.

Factory manualTaken from a Mazda factory workshop manual, with page citation.
Procedure

Original R-134a system. Use R-134a recovery/recycling/recharging equipment and recover refrigerant before opening the system. Install the manifold gauge set with both side valves closed before connecting the high/low service couplers. Connect the vacuum pump to the manifold center joint, and the tap-pin side of the charging hose to its air-purge valve. Connect the tank to the charging hose and place it on a scale, keeping the tank supply closed for evacuation. Open the manifold valves and operate the vacuum pump. After the stated time and gauge readings, close each manifold valve before stopping the pump. Wait about five minutes and inspect the low-side reading. If it changes, check for leaks and repeat evacuation. If unchanged, proceed to the separate preliminary refrigerant leak check. These are signed manifold gauge readings, not absolute pressure.

Applies to
  • NB 2005 (BP-Z3/BP-Z3-TURBO)
  • NB 2004 (BP-Z3-TURBO) — 2005 Mazdaspeed applicability is supported by the cited 2005 factory pages; 2004 Mazdaspeed follows the owner-approved 2004–2005 Mazdaspeed carry-over policy. No 2004 Mazdaspeed revision verification is claimed.
  • Verified in: 2005 Mazda MX-5 Miata Workshop Manual (electronic manual capture)

Sources (1)

View 1 source citations
  • 2005 Mazda MX-5 Miata Workshop Manual (electronic manual capture)Tier 1
    Page Refrigerant Charging (PDF pp.1741–1742) · Printed value & notes
    Page Refrigerant Charging (PDF pp.1741–1742)
    Printed: “Start the vacuum pump and let it operate for 15 min. Verify that the high and low-pressure side readings of the manifold gauge are at –101 kPa {–760 mmHg, –29.9 inHg}. Close each valve of the manifold gauge. Stop the vacuum pump and wait for about 5 min. If the reading has changed, check for leaks and then repeat from Step 7.”