Automatic transmission throttle-cable O-ring renewal (1999–2000)
Lubricate a new O-ring with ATF and install it on the transmission throttle cable.Lubricate a new O-ring with ATF and install it on the transmission throttle cable.
For removal/installation of the transmission control cable at the case, connected to the valve-body throttle cam. Disconnect battery negative, clean the exterior, drain for access and follow the full oil-pan/strainer/valve-body removal and installation procedure. Replace the cable O-ring and oil it with ATF. Complete the factory cable adjustment, refill/temperature-dependent level inspection, mechanical test and road test before use. This replacement-parts requirement does not establish a cable-clearance value or staking datum; those remain under review.
- NB 1999–2000 (BP-4W, 4AT) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
- Verified in: 1999 Mazda MX-5 Miata Workshop Manual
Sources (1)
View 1 source citations
Page 05–13–9–10 (PDF pp. 486–487) · Printed value & notes
Page 05–13–9–10 (PDF pp. 486–487)Printed: “Remove the O-ring from the throttle cable. Apply ATF to the new O-ring. Install the O-ring to the throttle cable. Adjust the throttle cable. Carry out mechanical test. Carry out road test.”
Related service specs
- Automatic TCM range-input voltage reference (1999–2000)
- Automatic TCM overdrive switch and lamp voltage reference (1999–2000)
- Automatic TCM throttle voltage reference (1999–2000)
- Automatic TCM speed-signal voltage reference (1999–2000)
- Automatic TCM engine-speed input voltage reference (1999–2000)
- Automatic TCM shift and lockup solenoid output voltage reference (1999–2000)
- Automatic TCM power and ground voltage reference (1999–2000)
- Automatic TCM serial communication diagnostic limitation (1999–2000)