Showing specs for all NA & NB Miatas

Main relay continuity test (1999–2000)

Unpowered: A–B continuity. Battery positive on A and ground on B: C–D continuity.Unpowered: A–B continuity. Battery positive on A and ground on B: C–D continuity.

Factory manualTaken from a Mazda factory workshop manual, with page citation.
Procedure

Perform only when directed. Disconnect battery negative and remove the main relay identified beside the engine-bay fuse/relay block. Check coil continuity A–B unpowered with an ohmmeter. For the second row apply battery positive to relay A and ground to relay B, then check switched continuity C–D. Retain polarity as drawn; the relay circuit includes a diode. Use the removed-relay terminal labels, not the mirrored harness connector layout. Replace if incorrect and perform the specified supply/ground circuit checks as directed. Reconnect the main relay connector afterward. No numerical coil resistance is specified.

Applies to
  • NB 1999–2000 (BP-4W) — 1999 applicability is supported by the cited 1999 factory pages; 2000 follows the owner-approved 1999–2000 NB1 carry-over policy. No 2000 revision verification is claimed.
  • Verified in: 1999 Mazda MX-5 Miata Workshop Manual