Heater temperature blend control-wire adjustment (1990–1991)
Set the temperature blend lever to MAX-HOT; connect and clamp its wire with the heater-unit shutter lever all the way to the right in the factory illustration.Set the temperature blend lever to MAX-HOT; connect and clamp its wire with the heater-unit shutter lever all the way to the right in the factory illustration.
For reconnecting the factory heater temperature blend control wire after dashboard service. Select MAX-HOT at the control panel, then connect and clamp the wire at the shutter-lever position shown as MAXIMUM HOT in the factory S–52 illustration. Right refers to that illustrated lever view. After installation move the temperature blend control through its full HOT-to-COLD stroke and verify secure wire attachment and full travel. This is the temperature wire, separate from the airflow-mode and REC–FRESH wires. Do not transplant later rotary-control cable settings.
- NA 1990–1991 (B6) — 1990 applicability is supported by the cited 1990 factory pages; 1991 follows the owner-approved 1990-to-short-crank-1991 carry-over policy. No 1991 revision verification or long-crank applicability is claimed.
- Verified in: 1990 Mazda MX-5 Miata Workshop Manual
Sources (2)
View 2 source citations
Page S–52 (PDF p.559) · Printed value & notes
Part no. 1193-10-89CPage S–52 (PDF p.559)Printed: “Temperature blend wire Set the temperature blend lever to MAX-HOT position. Connect and clamp the wire with the shutter lever on the heater unit all the way to the right. After installation, move the temperature blend lever to be sure the wire is securely attached, and that it moves the full stroke from HOT to COLD.”Page U–25 (PDF p.768) · Printed value & notes
Part no. 1193-10-89CPage U–25 (PDF p.768)Printed: “Set the temperature blend lever to maximum hot position. Connect and clamp the wire with the shutter lever on the heater unit all the way to the right. After installation, move the temperature blend le- ver to be sure the wire is securely attached and that it moves the full stroke from HOT to COLD.”
Related service specs
- Original A/C running refrigerant pressures (1990–1991)
- Heater blower-motor connected feed voltage (1990–1991)
- Heater blower-resistor connected voltage checks (1990–1991)
- Heater blower-switch connected voltage checks (1990–1991)
- A/C magnetic-clutch connected feed voltage (1990–1991)
- A/C condenser-fan connected voltage checks (1990–1991)
- Original A/C refrigerant sight-glass indications (1990–1991)
- Heater temperature blend control-wire adjustment (1992–1993)